Checkoff Sheet MS-2014-00697.tif Z009 INTERNATIONAL RESIDENTIAL CODE
CITY OF BLAIR REROOFWG CHECKOFF SHEET
Return to Stair City Hall prior to Final Inspection
218 S 16 Street, Stair, NE 68008
Because of limitations caused by the infeasibility to perform detailed Inspections which would
g_ot interfere with reroofing work, please Indicate c o *
o the following requirements
f this reroofing job.
Property Address: /7�� SzviL S-�
Contractor or Homeowner (if self)
Permit#: MS-2014- C � �.
Installation Date:
YES NO
The materials and methods of application used for recovering or replaQ!ng the existing
roof covering comply with the requirements of the building code'. (89071)
An lea barrier that consists of at least two layers of
underlayment or of a self-adhering polymer modified biturnen sheet Was installed and
extends A least front the ea
ve's ed g e to -a point at least 24 inches inside the exterior
wall line of the building. (R905.2.7.1)
ti STRUCTURAL COMPONENTS ARE SOUNa.- The structural roof components are
capable of supporting the roof covering system and the material and equipment loads
that will be encountered during installation of the roof, covering system. (R907,2)
r--xiSTING COVERING WAS REMOVED- Existing roof covering was removed for one
of the reasons required by section R907.3
DIL) No USE RUSTED METAL OR kA,5HING,-, Existing vent lashing, metal edges,
drain outlets, collars or metal co unter- flashing were not reinstalled if rusted. (R907,5)
FLA$ HING INSTALLED PROP9qMz' Flashing shall be reconstructed In accordance
with approved manufacturer's installation
, instructions, Metal flashing to which
bituminous materials are to be adhered shall be primed prior to Installation. (R907.6),
01 9nature of Primary installer Date
SI
gn Date
1 0�, YAk C)