Loading...
Checkoff Letter MS-2014-01390.tif i i i i_ CITY Ur DLAIQ Po"' M rse of I Donald Andersen & Family March 16, 2015 235 S 9th St Blair NE 68008 j Permit Number: MS- 2014 -01390 Roof, gutters, siding windows, Permit Address: 1839 Colfax St DearContractor, The Roofing Inspection for the above referenced permit has passed inspection, but no Roofing Checkoff Sheet has been turned in for this permit. A signed Roofing Checkoff Sheet is required as certification that all work was performed in accordance with the 2009 Building Code. A blank Roofing Checkoff Sheet is enclosed for your convenience. Please complete the form immediately and return it by email (stormdamage @ci.blair.ne.us), by fax (402.426.4195) or by mail (218 S 16th St, Blair, NE, 68008). If you do not return a completed Roofing Checkoff Sheet within 60 days of the date of this notice, you will forfeit the $50.00 deposit associated with this permit and we will turn this issue over to the City of Blair Licensing Board and City Attorney to consider suspending your contractor registration. i If you have questions about the Roofing Checkoff Sheet, please call the Blair Building Department at 402.426.4191. Thankyou in advance for your cooperation in this matter. I Sincerely, 6/WW Phil Green Assistant City Administrator O TiUgrtY 218 South 16th Street • Blair, Nebraska 68008 • 402 -426 -4191 e Fax 402 -426 -4195 E -mail cityofblair @cl,blair.ne;us aW