Loading...
Checkoff Sheet MS-2014-03240.tif ` 2009 INTERNATIONAL RESIDENTIAL CODE °�' iN Return to Blair City Hall prior to Final inspec 218 S 16� Street, Blair, NE 68008 Because of limitations caused by the infeasibility com p liance d etai l ed fhe I nspections f 1 owing r quirements not interfere with reroofing work, please ind p following this reroofing job. Permit #' _ 1 "2o 11 Installation Dater I YES NO The materials and methods of application used for recovering or replacing the existing roof covering comply w1th the requirements of the building code. (8907.1) [3 ICE PROTECTION INSTALLED; An ice barrier sheet least t was two nstalled and underlayment or of a self - adhering polymer modified bitumen extends at least from the eave &! . edge to a poinfi at least 24 inches Inside the exterior wall line of the building. (R905.2.7-1) i (� STRUCTURAL COMPON ARE SOUND: The structural roof components are capable of supporting the Woof covering system and the material and equipment loads tion of the roof covering system, that will be encountered during Installa (R907.2) TiNG CpVERiNG WAS REMOVED: Existing roof covering was removed for one [� E3CIS � of the reasons required by section 8907.3 [� [� NO RUSTS ©11tlETAL OR FLASHING. Existing vent flashing, metal edges, drain outlets, collars or metal counter - flashing were not reinstalled if rusted. (8907 - ) FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance with approved manufacturer 's instal a $ 11 p pr odto installation. (11907.6) bituminous materials are to be I be ! Date Signature of Primary Installer c ignatu of Permit Holder ! Date - - -- - -- - -. . -..-