Checkoff Sheet MS-2014-02964.tif L4U
ATIONAL RESIDENTIAL CODE
2009 INTERN
CITY OF BLAIR REROOFING
Return to Blair C Dail prior to Final Inspection
218 16 Street, B lair 7 NE 68008
infeasibility to perform detailed inspections which would
Because of limitations caused by the �nfeas y p
not interfere with reroofing work, please indicate compliance with the following requirements
following this reroofing job.
Permit a
D79
Installation Date. -�
YES NO
Q The materials and methods of application used for recovering or replacing the existing
roof covering comply with the requirements of the building code. (R907.1) i
❑ ICE PROTECTION INSTALLED: An ice barrier that consists of at least two layers of
underlayment or of a self- adhering polymer modified bitumen sheet was installed and
extends at least from the eave's edge to a point at least 24 inches inside the exterior
wall line of the building. (8905.2.7.1)
Q STRUCTURAL GOMPONENTS ARE SOUND: The the material and equipment loads
capable of supporting the roof covering system an
r that will be encountered during installation of the roof covering system. (8907.2)
Q EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one
r of the reasons required by section R907.3
I
Q NO RUSTED METAL OR FLASHING: Existing vent flashing, metal edges, drain
outlets collars or metal counter -- flashing were not reinstalled if rusted. (8907.5)
.� FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance
with approved manufacturer's installation instructions. Metal flashing to which
bituminous materials are to be adhered shall be primed prior to installation. (8907.6)
Signature of Primary Installer
Date �
Signatur ' o Permit Haider Da e