Loading...
Checkoff Sheet MS-2014-02964.tif L4U ATIONAL RESIDENTIAL CODE 2009 INTERN CITY OF BLAIR REROOFING Return to Blair C Dail prior to Final Inspection 218 16 Street, B lair 7 NE 68008 infeasibility to perform detailed inspections which would Because of limitations caused by the �nfeas y p not interfere with reroofing work, please indicate compliance with the following requirements following this reroofing job. Permit a D79 Installation Date. -� YES NO Q The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (R907.1) i ❑ ICE PROTECTION INSTALLED: An ice barrier that consists of at least two layers of underlayment or of a self- adhering polymer modified bitumen sheet was installed and extends at least from the eave's edge to a point at least 24 inches inside the exterior wall line of the building. (8905.2.7.1) Q STRUCTURAL GOMPONENTS ARE SOUND: The the material and equipment loads capable of supporting the roof covering system an r that will be encountered during installation of the roof covering system. (8907.2) Q EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one r of the reasons required by section R907.3 I Q NO RUSTED METAL OR FLASHING: Existing vent flashing, metal edges, drain outlets collars or metal counter -- flashing were not reinstalled if rusted. (8907.5) .� FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance with approved manufacturer's installation instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation. (8907.6) Signature of Primary Installer Date � Signatur ' o Permit Haider Da e . 2-