Loading...
Checkoff Sheet MS-2014-02265.tif 90 L- t 2 1 HS 2009 INTERNATIONAL RES IDENTI AL CITY OF BLAIR REROOFING CKECKOFF SHEET Return to Blair Cit Hall prior to Final Inspection 218 S 16 Street, Blair, NE 68008 Because of limitations caused by the Infeasibility com h awing r quit ments woul d nspections which not interfere with reroofing work, ►lease indicate p Foliflwin this reroofing job. Permit # 0 i Installation. Date, YES NO The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (8907.1) layers of [� ICE PROTECTION INSTALLf =D: An ice barrier that consists of was t insta l d and o! mer modified bitumen sheet undertayment or of aself- adhering p y extends at least Pram the Dave's edge to a paint at feast 24 inches inside the exterior wall line of the building. (8905.4 -i ) STRUCTURAL COMPONENTS ARE SO $ em and the material and equipment loads capable of supporting the roof covering y that will be encountered during installation of the roof covering system. (R907.2) i i EXISTING CQVI±RING WAS REMOVED: Existing roof covering was removed for one of the reasons required by section 8907.3 METAL OR FLASHING. Existing vent flashing, metal edges, drain NO RUSTED M R907.5) outlets, collars or metal counter - Flashing were not reinstaile d if rusted. { � FLASHING INSTALLED PR: PERLY: Flashing shall be reconstructed in accordance with approved manufacturer's installation instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation. (11907.6) I Signature of Primary Installer Date ign e of Perini Holder ate a