Checkoff Sheet MS-2014-02265.tif 90 L- t 2
1 HS
2009 INTERNATIONAL RES IDENTI AL
CITY OF BLAIR REROOFING CKECKOFF SHEET
Return to Blair Cit Hall prior to Final Inspection
218 S 16 Street, Blair, NE 68008
Because of limitations caused by the Infeasibility com h awing r quit ments woul d nspections which
not interfere with reroofing work, ►lease indicate p
Foliflwin this reroofing job.
Permit # 0
i
Installation. Date,
YES NO
The materials and methods of application used for recovering or replacing the existing
roof covering comply with the requirements of the building code. (8907.1)
layers of
[� ICE PROTECTION INSTALLf =D: An ice barrier that consists of was t insta l d and
o! mer modified bitumen sheet
undertayment or of aself- adhering p y
extends at least Pram the Dave's edge to a paint at feast 24 inches inside the exterior
wall line of the building. (8905.4 -i )
STRUCTURAL COMPONENTS ARE SO $ em and the material and equipment loads
capable of supporting the roof covering y
that will be encountered during installation of the roof covering system. (R907.2)
i
i
EXISTING CQVI±RING WAS REMOVED: Existing roof covering was removed for one
of the reasons required by section 8907.3
METAL OR FLASHING. Existing vent flashing, metal edges, drain
NO RUSTED M R907.5)
outlets, collars or metal counter - Flashing were not reinstaile d if rusted. {
�
FLASHING INSTALLED PR: PERLY: Flashing shall be reconstructed in accordance
with approved manufacturer's installation instructions. Metal flashing to which
bituminous materials are to be adhered shall be primed prior to installation. (11907.6)
I
Signature of Primary Installer
Date
ign e of Perini Holder
ate
a