Checkoff Sheet MS-2014-01898.tif i
INTERNAT AL RESIDENTI
CITY OF BLAIR REROOFING CHECKOFF SHEET
R eturn to lair City Hall prior to Final Inspection
2�I8 X16 �ret, Blair, NE 68008
Because of limitations caused by the unfeasibility to perform detailed inspections which would
not interfere with reroofing work, please indicate compliance with the following requirements
following this reroofing job.
Permit #: !�J S i
Installation Date: ` /0— /
YES NO
i
0 ' C3 The materials and methods of application used for recovering or replacing the existing
roof covering comply with the r quirements of the building code. (R907.1)
❑ ICE PROTECTION INSTALLEb An ice barrier that consists of at least two layers of
underlayment or of a self - adhering polymer modified bitumen sheet was installed and
extends at least from the eave's edge to a point at least 24 inches inside the exterior
wall line of the building. (8905.2.7.1)
- ® STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are
capable of supporting the roof covering system and the material and equipment loads
that will be encountered duringi installation of the roof covering system. (1907.2)
EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one
of the reasons required by section R907.3
NO RUSTED METAL OR FLASHING: Existing vent flashing, metal edges, drain
outlets, collars or metal counter flashing were not reinstalled if rusted. (R907.5)
- FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance
with approved manufacturer's installation instructions. Metal flashing to which
bituminous materials are to be adhered shall be primed prior to installation. (R907.6)
i
i
Signature of Primary Installer Date
I
Signafure of Permit Holder j Date
i
. 1 2-