Checkoff Sheet MS-2014-01281.tif i
i
!
i
INTERNATIONAL I . TI L. CODE
CIT OF BLAIR REROOFING CHECKOFF SHEET
Return to Blair City Hall prior to Final Inspection f
218 S 16 Street, Blair, NE 68008
i
Because of limitations caused by the infeasibility to perform detailed Inspections which would
not interfere with reroofing work, please indicate compliance with the following requirements
followin this reroofing job.
Permit #: �Ms- a g' 01 asl
Installation Date: Z
YE NO
The materials and methods of application used for recovering or replacing the existing
roof covering comply with the requirements of the building code. (89071)
® ICE PROTECTION INSTALLED An ice barrier that consists of at least two layers of
underlayment or of a self - adhering polymer modified bitumen sheet was installed and
extends at least from the eave's edge to a point at least 24 inches inside the exterior
wall line of the building. (R905.2.7.1)
[uJ Q STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are
capable of supporting the roof covering system and the material and equipment loads
that will be encountered during installation of the roof covering system. (R907.2)
® EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one
of the reasons required by section R907.3
® NO RUSTED METAL OR FLASHING: Existing vent flashing, metal edges, drain
outlets, collars or metal counter- flashing were not reinstalled if rusted. (R907.5)
® FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance
with approved manufacturer's installation instructions. Metal flashing to which
bituminous materials are to be adhered shall be primed prior to installation. (R907.6)
i !
Sign ' of Pr' ary Installer Date
5
Signat of Permit Holder Date