Loading...
Checkoff Sheet MS-2014-00356 (2).tif i 2009 INTERNATIO AL RESIDENTIAL CODE CITY OF BLAIR REROOFING Return to Blair city Hall prior to Final inspection 218 S W Sheet, Blair, NE 8$008 Because of limitations caused by the infe sibllity to perform detailed inspections which would not interfere with reroofing work, please ifidicate compliance with the following requirements following this reroofing job. Permit #. installation Dame•. - YES NO The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (R907A) ® ICE PROTECTION INSTALLED: An ice barrier that consists of at least two layers of underiayrnent or of a self - adhering polymer modified bitumen sheet was installed and extends at least from t he eavefs ed a to a point at least 24 inches inside the exterior wall line of the building. (R905.2.7.1) I STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are capable of supporting the roof covering system and the material and equipment loads that will be encountered Burin installation of the roof covering system. (8907.2) ° EmSTING COVERING WAS REMOVED: Existing roof covering was removed for one i of the reasons required by se. ion 8907.3 r- - No RUSTED METAL OR FLASHING: Existing vent flashing, metal edges, drain outlets, collars or metal count 6r-flashing were not reinstalled if rusted. (R907.5) FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance with approved manufacture' s installation instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation. (R.9Q7.6) Signature of Primary Installer Date I � f., ign 'cure of Permit Holder ©at I