Loading...
Checkoff Letter MS-2014-03339.tif i I _ x i V I utt BL �Q TY isO Ot Jorgensen Contracting, Inc. March 11, 2015 530 Front St Blair NE 68008 l Permit Number: MS- 2014 -03339 Roof, metal walls on Out Building Permit Address: 9477 Cord P35 Dear Contractor, The Roofing Inspection for the above referenced permit has passed inspection, but no Roofing Checkoff Sheet has been turned in for this permit. A signed Roofing Checkoff Sheet is required as certification that all work was performed in accordance with the 2009 Building Code. A blank Roofing Checkoff Sheet is enclosed for your convenience. Please complete the form immediately and return it by email (stormdamage @ci.blair.ne.us), by fax (402.426.4195) or by mail (218 S 16th St, Blair, NE, 68008). If you do not return a completed Roofing Checkoff Sheet within 60 days of the date of this notice, you will forfeit the $50.00 deposit associated with this permit and we will turn this issue over to the City of Blair Licensing Board and City Attorney to consider suspending your contractor registration. If you have questions about the Roofing Checkoff Sheet, please call the Blair Building Department at402.426.4191. Thank you in advance foryour cooperation in this matter. Sincerely, ?W 6AWJ Phil Green Assistant City Administrator i 00 oA.n 218 South 16th Street • Blair, Nebraska 68008 ^ 402 -426 -4191 Fax 402 -426 -4195 E -mail dtyofblalr @cl.blalr,ne,us i i