Checkoff Letter MS-2014-00986.tif I
i
I
F
LAIQ
CITY Of
P iSe OI
ai d
Complete Industries Inc March 9, 2015 j
8910 Washington Cir
Omaha NE 68127
Permit Number: MS- 2014 -00986
Roofing
Permit Address: 160 Skyblue Dr
Dear Contractor,
referenced permit has
The Roofing Inspection for the above r passed inspection, but p p
no Roofing Checkoff Sheet has been turned in for this permit. A signed Roofing
Checkoff Sheet is required as certification that all work was performed in
accordance with the 2009 Building Code.
A blank Roofing Checkoff Sheet is enclosed for your convenience. Please complete
the form immediately and return it by email (stormdamage @ci.blair.ne.us), by fax
(402.426.4195) or by mail (218 S 16th St, Blair, NE, 68008).
If you do not return a completed Roofing Checkoff Sheet within 60 days of the date
of this notice, you will forfeit the $50.00 deposit associated with this permit and we
will turn this issue over to the City of Blair Licensing Board and City Attorney to
consider suspending your contractor registration.
If you have questions about the Roofing Checkoff Sheet, please call the Blair
Building Department at 402.426.4191.
Thank you in advance for your cooperation in this matter.
Sincerely,
Phil Green
Assistant City Administrator j
j
218 South 16th Street • Blair, Nebraska 68008 402 -426 -4191 • Fax 402 -426 -4195 E -mail c1tyofb1a1r@c1,b1a1r,ne.us
i