Checkoff Sheet MS-2015-00085.tif 2009 INTERNATIONAL RESIDEN
C I T- 0 F 13 L A f R k E R 0' 60" 140" C H, Eb K 'O'F' P "S 't e T,
, A
r Return to Blair City H411 p Nor tb final In ec i
218 S th Street, Iair
Because of limitations caused by the infeasibility to perform detailed Inspections which would
nmt interfere with reroofing work please indicate compliance with the following "irequ refnents
following this reroofing job.
Property Address:
z j
Contractor or Homeowner (if self)
Permit #e - ) A
Installation Date:
YES' NO '
The materials and methods of application used fQr recovering or replacing the existing
roof covering comply with the. requirements of the building cod %' '1)
ICE PkO'1"ECTION INSTALLED An ice barrier that consists of at least two,layers of
Al i � underlayment or of a self- adhering polymer modified bitumen sheet installed and
V extends at least from tha eave's edge to -a point at least'24 inches inside the exterior
wall line of the building.`(8905.2.7.'1)
STRUCTURAL COMPONENTS ARE SOUND': The structural roof components are f
capably of supporting the, roof, covering ,system and the. matenal,and equipment, loads
that will be encountered during installation of the roof covering system ' (8907.2)
EXISTING COVERING WAS REMOVED m Existing roof covering was removed for one
of the reasons required by section 8907.3 ;
DID NOT USE RUSTED METAL OR FLASHING: Existing tent flashing, mefal edges,
drain oufeets, collars or metaGcpunter- flashing were not reinstalled ff rusted (8507.5}
FWHING INSTALLED PROPERLY. Flashing shall be reconstructed in accordance
with approved "manufaeturees =installation instructlons. Fetal fleshing to which°
bituminous materials are to be adhered shall be primed prior to installation. (8907,6)
,
Sig re of I' Infalle - Doe
afore n rmi older .' to
i