Checkoff Sheet MS-2014-02705 (2).tif 1 �
orf
2009 INTERNATIONAL RESIDENTIAL CODE -
CITY OF BLAIR REROOFING
Return to Blair City Hall prior to Final inspection
218 S W" Street, Blair~, NE 68 008
Because of limitations caused by the infeasibiiitY to perform detailed inspections which would
not interfere with reroofing work, please indicate compliance with the following requirements
following this reroofing job.
Permit #•
I
Y ll,nL.
Installation
YES NO
I� The materials and methods of application used for recovering or replacing the existing
t T roof covering comply with the requirements of the building code. (R907. i)
ICE PROTECTION INSTALLED: An ice barrier that consists of at least two layers of
unriayme or of a self-adhering polymer modified bitumen sheet was installed and
de nt
extends at least from the eave ° s edge- to a point at exte rior
[east 24 inches inside the exte
wall line of the building. (R905.2.7.1)
® STRUCTURAL COMPONENTS ARE SouND. The structural roof components are
capable of supporting the roof covering system and the material and equipment loads
that will be encountered during installation of the roof covering system. (R907.2)
e Ei£ISTING GfIVERING WAS REMOVED Existing roof covering was removed for one
of the reasons required by section R907.3
RUSTEt Mi~T metal coup esflashing were not ei flashing n
reinstalled if rusted. (R9075)
outlets, collars or m
n
FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance
with approved manufacturer's installation instructions. Metal flashing to which
bituminous materials are to be adhered shall be primed prior to installation. {R907.0)
Signature of Primary Installer
Date
../�,
rgn turn of Perrnit Holder
l,'d 09Z96££-z0t' 10iae}x3 e}eldwoo d6£ :909L 90 aeW