Loading...
Checkoff Sheet MS-2014-02705 (2).tif 1 � orf 2009 INTERNATIONAL RESIDENTIAL CODE - CITY OF BLAIR REROOFING Return to Blair City Hall prior to Final inspection 218 S W" Street, Blair~, NE 68 008 Because of limitations caused by the infeasibiiitY to perform detailed inspections which would not interfere with reroofing work, please indicate compliance with the following requirements following this reroofing job. Permit #• I Y ll,nL. Installation YES NO I� The materials and methods of application used for recovering or replacing the existing t T roof covering comply with the requirements of the building code. (R907. i) ICE PROTECTION INSTALLED: An ice barrier that consists of at least two layers of unriayme or of a self-adhering polymer modified bitumen sheet was installed and de nt extends at least from the eave ° s edge- to a point at exte rior [east 24 inches inside the exte wall line of the building. (R905.2.7.1) ® STRUCTURAL COMPONENTS ARE SouND. The structural roof components are capable of supporting the roof covering system and the material and equipment loads that will be encountered during installation of the roof covering system. (R907.2) e Ei£ISTING GfIVERING WAS REMOVED Existing roof covering was removed for one of the reasons required by section R907.3 RUSTEt Mi~T metal coup esflashing were not ei flashing n reinstalled if rusted. (R9075) outlets, collars or m n FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance with approved manufacturer's installation instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation. {R907.0) Signature of Primary Installer Date ../�, rgn turn of Perrnit Holder l,'d 09Z96££-z0t' 10iae}x3 e}eldwoo d6£ :909L 90 aeW