Loading...
Checkoff Sheet MS-2014-02262.tif i i 20 IN C ITY OF BLAIR REROOFING CHECKOFF SHEET Return to Blair City Hall prior to Final (n pection 218 S 1G y Street Blair, NB Because of limitations caused by the infeasibility to perform detailed inspections which would not Interfere with reroofing work, please indicate compliance with the following requirements fcillowing_ reroofing job. permit #: 2-0 �`'t` Installation Date: YES NO The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (R907.9) ICE pRO ECTIDN [RISTALLED: An ice barrier that consists of at feast two layers of under y la meat or of a self - adhering polymer modified bitumen sheet was_ Lin-stalled and extends at least from the eave's edge to a potnt at least 24 inches inside the exterior wall line of the buiiding. (11906.23.1) STRUCTURAL COMI�ONENTS ARE SOUND: The structural roof components are capable of supporting the roof covering system and the material and equipment loads i that will be encountered during installation of the roof covering system. (R907.2) i EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one of the reasons required by section R907.3 �- NO RUSTED i1f1ETAL QR FLASHING: Existing vent flashing, metal edges, drain outlets, collars or metal counter - flashing were not reinstalled if rusted. (11907.6) _ FLASHING INSTALLED pRo�ERLY: Flashing shall be reconstructed in accordance with approved manufacturer's installation instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation. (R907.6) Signature of Primary Installer Date Date s ign ure of Permit Holder Z'd 09Z96E£-ZOb a01a e}eldwoo d99:ti09690aeW