Checkoff Sheet MS-2014-02262.tif i
i
20 IN
C ITY OF BLAIR REROOFING CHECKOFF SHEET
Return to Blair City Hall prior to Final (n pection
218 S 1G y
Street Blair, NB
Because of limitations caused by the infeasibility to perform detailed inspections which would
not Interfere with reroofing work, please indicate compliance with the following requirements
fcillowing_ reroofing job.
permit #: 2-0 �`'t`
Installation Date:
YES NO
The materials and methods of application used for recovering or replacing the existing
roof covering comply with the requirements of the building code. (R907.9)
ICE pRO ECTIDN [RISTALLED: An ice barrier that consists of at feast two layers of
under y la meat or of a self - adhering polymer modified bitumen sheet was_ Lin-stalled and
extends at least from the eave's edge to a potnt at least 24 inches inside the exterior
wall line of the buiiding. (11906.23.1)
STRUCTURAL COMI�ONENTS ARE SOUND: The structural roof components are
capable of supporting the roof covering system and the material and equipment loads i
that will be encountered during installation of the roof covering system. (R907.2) i
EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one
of the reasons required by section R907.3
�- NO RUSTED i1f1ETAL QR FLASHING: Existing vent flashing, metal edges, drain
outlets, collars or metal counter - flashing were not reinstalled if rusted. (11907.6)
_ FLASHING INSTALLED pRo�ERLY: Flashing shall be reconstructed in accordance
with approved manufacturer's installation instructions. Metal flashing to which
bituminous materials are to be adhered shall be primed prior to installation. (R907.6)
Signature of Primary Installer Date
Date
s
ign ure of Permit Holder
Z'd 09Z96E£-ZOb a01a e}eldwoo d99:ti09690aeW