Checkoff Sheet MS-2014-02003.tif i
I NTERNATIONAL o6c ENTIAL CODE -
CITY OF BLAIR IN CHECKOFF SHEET
Return to Blair City Hall prior to Final Inspection
218 S 16 Street, Blair NE 68008
Because of limitations caused by the Infeasibility to perform detailed inspections which would
not interfere with reroofing work, please indicate compliance with the following requirements
following this roofing job.
Permit # : _ • [ Iic�`,�,,
Installation Date:
YES NO
r The materials and methods of application used for recovering or replacing the existing
roof covering comply with the requirements of the building code. (R907.1)
ICE PRt7'I"ECTION INSTALLED: An ice barrier that consists of at least two layers of
underlayment or of a self- adhering polymer modified bitumen sheet was installed and
extends at least from the eaye's edge to a point at least 24 inches inside the exterior
wall line of the building, (8905.2.7.1)
STRUCTURAL COMPONENTS ARE SOUND' The structural roof components are
capable of supporting the roof covering system and the material and equipment loads
that will be encountered during installation of the roof covering system. (R907.2)
® EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one
of the reasons required by section R907.3
� -- NO RUSTED METAL* OR Fl- ASHING: Existing vent bashing, metal edges, drain
outlets, collars or metal counter - flashing were not reinstalled if rusted. (8907.5)
I
I I
FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance
with approved manufacturer's installation instructions. Metal flashing to which
bituminous materials are to be adhered shall be primed prior to installation. (R907.6)
Date
Signature of primary installer I
f
01s
'9 1gridt ure of Permit Holder
I
6'd 09Z969£ -z0t aoiae}x:� e191dwoo d9i,:909690aeW