Checkoff Sheet MS-2014-01636.tif i
2009 INTERNATIONAL RESIDENTIAL CODE
CITY OF BLA REROOFING CHECKOFF SHEET
Return to Blair City Hall prior to Anal inspection
2 18 S 16S treet, Blair, NE 68
i
Because of limitations caused by the Ir►featalblllty to perform detailed Inspe6tions which would
- not interfere with reroofing work please indicate compliance with the following requirements �
I in this- reroofing job-
Prop" AddressU Caw
Contractor or Homeowner (if self) L
Permit #. MS-201
Installation Date: 7
YE No
The materials and methods of application used for recovering or replacing the existing
roof covering comply with the requirements of the building code. (11907.1)
ICE PROTECTION INSTALLED An ice barrier that consists of at least two layers of
underlayment or of a edlf- adhering polymer modifled bitumen sheet was installed and
extends at least from tlze to a point at least 24 inches Inside the exterior
wall line of the building. (11905.2.7.1)
STRUGTURAL COMPONEWS ARE ROUND: The structural components are
capable of supporting the roof coverina system and the material and equipment loads
thatwlll be encountbred during installation of the roof covering system. (11907.2)
L- XISTING COVERING WAS REMOVED. Exiating roof covering was removed for one
of the reasons required by section 8907.3
DID NOT USE RUSTED METAL OR FLASHING; Existing vent flashing, metal edges,
drain cutlets§, collars or metal counter - flashing were• not reinstalled if rusted. (11907.5)
FLASHING INSTALL -rcp MEERLYZ Flashing shall be reconstructed in accordant
with approved manufa.cturees installation Instructions. Metal flashing to which
bituminous materials are to be adhered shall be primed prior to installation. (11907.6)
at ary Installer bate
Si ure Of P ' Helder Bate
r �
TO/TO EDVcd NOIlonN1SNOD Sf e966VEL9Z8Z E1?:9T OZOZ/VB/OT