Loading...
Checkoff Sheet MS-2014-01636.tif i 2009 INTERNATIONAL RESIDENTIAL CODE CITY OF BLA REROOFING CHECKOFF SHEET Return to Blair City Hall prior to Anal inspection 2 18 S 16S treet, Blair, NE 68 i Because of limitations caused by the Ir►featalblllty to perform detailed Inspe6tions which would - not interfere with reroofing work please indicate compliance with the following requirements � I in this- reroofing job- Prop" AddressU Caw Contractor or Homeowner (if self) L Permit #. MS-201 Installation Date: 7 YE No The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (11907.1) ICE PROTECTION INSTALLED An ice barrier that consists of at least two layers of underlayment or of a edlf- adhering polymer modifled bitumen sheet was installed and extends at least from tlze to a point at least 24 inches Inside the exterior wall line of the building. (11905.2.7.1) STRUGTURAL COMPONEWS ARE ROUND: The structural components are capable of supporting the roof coverina system and the material and equipment loads thatwlll be encountbred during installation of the roof covering system. (11907.2) L- XISTING COVERING WAS REMOVED. Exiating roof covering was removed for one of the reasons required by section 8907.3 DID NOT USE RUSTED METAL OR FLASHING; Existing vent flashing, metal edges, drain cutlets§, collars or metal counter - flashing were• not reinstalled if rusted. (11907.5) FLASHING INSTALL -rcp MEERLYZ Flashing shall be reconstructed in accordant with approved manufa.cturees installation Instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation. (11907.6) at ary Installer bate Si ure Of P ' Helder Bate r � TO/TO EDVcd NOIlonN1SNOD Sf e966VEL9Z8Z E1?:9T OZOZ/VB/OT