Loading...
Checkoff Sheet MS-2014-01558.tif INTERNATIONAL I NTI CITY OF BLAIR REROOFING Return to Blair CAty Haft prior to Final Inspection 218 S 16 Street, Blair, NE 68008 Because of limitations caused by the infeasibility to perform detailed inspections which would not interfere with reroofing work, please indicate compliance with the following requirements ; following this reroofing job. i Permit #° -� i b Installation Date: YES NO ❑ The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (R907.1) � Q ❑ ICE PROTECTION INSTALLED An ice barrier that consists of at least two layers of r, underlayment or of a self - adhering polymer modified bitumen sheet was installed and extends at least from the eave's edge to a point at least 24 inches inside the exterior wall line of the building. (8905.2.7.1) ® STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are capable of supporting the roof covering system and the material and equipment loads that will be encountered during installation of the roof covering system. (8907.2) ❑ EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one of the reasons required by section R907.3 k ❑ ❑ Na RUSTED METAL OR FLASHING: Existin g vent flashing, metal edges, drain outlets, collars or metal counter - flashing were not reinstalled if rusted. (8907.5) ❑ FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance with approved manufacturer's installation instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation. (8907.6) I Signature of Primary Installer Date � I I, Sign Lure of P rmit Holder Date I Z-d 09Z96££-ZOl� 1011eIx3 e;eldwoo d9Z:06 96 90 I I