Checkoff Sheet MS-2014-01558.tif INTERNATIONAL I NTI
CITY OF BLAIR REROOFING
Return to Blair CAty Haft prior to Final Inspection
218 S 16 Street, Blair, NE 68008
Because of limitations caused by the infeasibility to perform detailed inspections which would
not interfere with reroofing work, please indicate compliance with the following requirements ;
following this reroofing job. i
Permit #° -� i b
Installation Date:
YES NO
❑
The materials and methods of application used for recovering or replacing the existing
roof covering comply with the requirements of the building code. (R907.1) �
Q ❑ ICE PROTECTION INSTALLED An ice barrier that consists of at least two layers of
r,
underlayment or of a self - adhering polymer modified bitumen sheet was installed and
extends at least from the eave's edge to a point at least 24 inches inside the exterior
wall line of the building. (8905.2.7.1)
® STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are
capable of supporting the roof covering system and the material and equipment loads
that will be encountered during installation of the roof covering system. (8907.2)
❑ EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one
of the reasons required by section R907.3
k
❑ ❑ Na RUSTED METAL OR FLASHING: Existin g vent flashing, metal edges, drain
outlets, collars or metal counter - flashing were not reinstalled if rusted. (8907.5)
❑ FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance
with approved manufacturer's installation instructions. Metal flashing to which
bituminous materials are to be adhered shall be primed prior to installation. (8907.6)
I
Signature of Primary Installer Date
� I I,
Sign Lure of P rmit Holder Date
I
Z-d 09Z96££-ZOl� 1011eIx3 e;eldwoo d9Z:06 96 90
I
I