Loading...
Checkoff Sheet MS-2014-01181.tif Mar 0515 04:51 p Complete Exterior 402 - 3316260 p.1 2009 INTERNATIONAL RESIDENTIAL (%;ODE r i I i CITY OF BLAIR REROOFING Return to Blair pity Half prior to Final inspection 218 S 16 Street, Blair, NB 68008 Because of limitations caused by the infeasibility to perform detailed Inspections which would not interfere with reroofing work, please indicate compliance with the following requirements following this reroofing job. Permit Installation Date: YES NO ❑ The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (R907.1) ICE PROTECTION INSTALLED An ice barrier that consists of at least two layers of underlayment or of a self - adhering polymer modified bitumen sheet was installed and extends at least from the eave's edge to a point at I east 24 inches inside the exterior wall line of the building. (8905.2.7.1) ❑ STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are capable of supporting the roof covering system and the material and equipment loads that will be encountered during installation of the roof covering system. (8907.2) ❑ EXISTING COWERING WAS REMOVED: Existing roof covering was removed for one of the reasons required by section 8907.3 NO RUSTED METAL OR FLASHING. Existing vent flashing, metal edges, drain outlets, collars or metal counter - flashing were not reinstalled if rusted. (8907.5) ❑ FLASHING INSTALLED PROPERLY: f=lashing shall be reconstructed in accordance with approved manufacturer's installation instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation. (R907.6) Signature of Primary Installer Date i Qr Wriatbre of Permit Holder D to 40