Loading...
Checkoff Sheet MS-2014-00358 (2).tif i PO INTERNATI REROO CITY OF BLAIR Return to Blair cit Haw prior to Final inspection 218 S 16 Street, Blair, NE 68008 Because of limitations caused by the infeasibility to perform detailed inspections which would not interfere with reroofing work, please indicate compliance with the following requirements following this reroofing job. Permit #: Installation Date; YES H 0 The materials and methods of application used for recovering or replacing the existing '` roof covering comply with the requirements of the building code. (8907.1) ICE PR4 TECTION INSTALLED: An ice barrier that consists of at least tt1vo layers of underlaymenf or of a self adhering polymer modified bitumen sheet was installed and extends at [east from the eaue's ed a to a point at least 24 inches inside the exterior wall line of the building, STRUCTURAL COMPONENTS ARE SOUND. The structural roof components are capable of supporting the roof covering system and the material and equipment loads that will be encountered during Installation of the roof covering system. (R907.2) EXISTING GiaVERING Vt1AS REMOVED; Existing roof covering was removed for one of the reasons required by sectlon 8907.3 i — NO RUSTS© METAL OR FLASHING. Existing 3 if r rusted (R9D7 5) outlets, collars or metal counter-flashing were n ot reinstalled FLASHING 1wSTALLE© pROPERLY: Flashing shall be reconstructed in accordance s installation instructions. Metal flashing to which with approved manufacturer' bituminous materials are to be adhered shall he primed prior to installation. (8907,6) Signature of Primary Installer Date lgnl JJ// A, � I : e j t°'�= `'1�._ ate ign re of Permit Holder �'d 09Z9698-Z0V a011e ;x3 e}eldwoC) d�0:909690a i