Loading...
Checkoff Sheet MS-2014-01634.tif 2009. INTERNATIONAL RESIDENTIAL CODE CITY OF 13LAIR REROOFIN'G" Return, it �t _ Hall � ' , lh ' t C i S treet, Blair', NE 68008 � Because dflirnitations caused by the infeasibility to perform detailed inspections which would j not interfere with reroofing work, please indicate compliance with the following requlre foliowlM this reroofing job. Y Property Address: ��e == .. Contractor or Homeowner (if self) & Y.. ... I C C Af i Permit #-. 14b ; Installation Date: IS 'Y ` NO The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code.�?(R907.1) ICE PRGTEGTION INSTALLED An ice barrier that consists of at least two layers of underlayment or of a self-adhering polymer modified bitumen sheet was Installed and ,, v` extends at least from the'eaye's edge to •a point at least 24 inches Inside the exterior i walI line of the bullding. (8905,2.7.1) STRUCTURAL COMPO ARE SOUND. The structural roof components are � capable of supporting the roof bovering systerri and the material,and equipment loads that will be encountered during installation of the roof covering, system. (R907.2) EXISTING COVERING WAS REMOVED Existing roof covering:wadf0mdved forene ` of the reasons required by section R907.3 DID NOT USE RUSTED METAL OR FLA�HII IS: Existitigventdashing, metal edges, drain outlets, collars or metal, counfer flash(ng were not relnsta[led if rusted. (8907.5} PUSHING INSTALLED PROPERLY Flashing shall be reconstructed In accordance with approved'manufacturees Installation instructions. - Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation. (8907,6) i atur r• ry In er ate 1 u '" ate -