Checkoff Sheet MS-2014-01170.tif i
200.9 INTERNATIONAL RESIDENTIAL CODE
CITY OF BLAIR REROOFING CHECKOFF SHEET
Return to Blair City Hall p to Final'inspection
6 th Street, Bla NE 68008
i
Because of limitations caused by the infeasibility to perform detailed Inspections which would
not interfere with reroofing work, please Indicate compliance with the following requirements
follovuin this' reroofing job.
Property Address.
Contractor or Homeowner (if self) : � �
Permit #c MS-2014- _ it 7L
Installatlon ate: l
YES NO
The materials and methods of application used for recovering or replacing the existing
roof covering comply with the requirements of the wilding code. (R907.1)
CE PROTECTION INSTALLE An ice barrier that consists of at least two layers of
underlayment or of a self adhering polymer modified bitumen sheet was intalled and
extends at least from the eave's edge to a point at least 24 inches inside the exterior
wall line of the building. (8905.2.7.1)
S TRUCTURAL COMPONENTS AR SOUND:- The structural roof components are
capable of supporting the roof covering system and the material and equipment loads
that will be encountered during installation of the roof covering system, (8907.2)
EXISTING COVERI G WA BE C ED Existing roof covering was removed for one
of the reasons required by section 1907,3
2 ID NOT USE RUSTED METAL OR FLASHING: Exlsting•vent flashing, metal edges,
drain outlets, collars or metal counter-flashing were not reinstalled if rusted. (8907.5)
FLASHING INSTALLED PROPERL Flashing shall be reconstructed in accordance
with approved manufacturer's installation instructions. Metal flashing to which j
bituminous materials are to be adhered shall be primed prior to Installation. (8907.5) (�
� f
re of Primary Installer e ,
Signa ' a Hol
der r ate
i
i
I