Loading...
Checkoff Sheet MS-2014-01039.tif 2009 INTERNATIONAL RESIDENTIAL CODE CITY OF BLA IR REROOFIN.G CHECKOFF 4 SHEET R eturn to Blair C It, all prior to Final Inspection � 218 s 16 street, Blair, NE 68008 because of limitations caused by the infeasibility to perform detailed inspections which would not interfere with reroofing work, Tease indicate compliance with the following requirements followin this reroofing Sob. 3 Property Address: q m , Contractor or Homeowner (if sett :. d a rcrYS Permit #. MS-20 ) Installation Date. YES Na The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (R907.1) lCE PROTECTION INSTALLED: An ice barrier that consists of at least two layers of underlayment or of a self- adhering polymer modified bitumen sheet was installed and extends at least from the eave's edge to -a point at least. 24 inches inside the exterior wall line of the building, (R905.2.7.1) STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are capable of supporting the roof covering system and the material and equipment loads that will be encountered during installation of the roof covering system. (8907.2) EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one of the reasons required by section R907.3 DID NOT USE RUSTED METAL OR FLASHING, Existing vent flashing, metal edges, drain outlets, collars or metal counter- flashing were not reinstalled if rusted. (8907.5) FLAB* HING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance with approved manufacturer's installation instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation. (11907.6) Slgn fu-re- Primary Installer Date 1,22 5 Date Signat re of Permit Holder I