Checkoff Sheet MS-2014-00620.tif i
i
,r. Feb, 26. 2015 2:41PM _.... _._ No. 1067 P. 1
INTERNAT
CITY OF BLAIR REROOFING CHECKOFF SHEET
I
Raturn to Blair city Ha ll Pelor to final I nspection
218 S 1e Street, dair NE 68008
Because of limitations ca iuiaed by the Itifeasibilify to perform detailed Inspection& which would j
e indieate compliance with tha failowing requirements
not Interfere with reroofing work, pleas
follawlan #ills rerooting Job•
Pormitp;
Installation Late•
YES, NO
The materiels and methods of applioatian used for recovering or zapiacing the existing
root covering comply with the requimmonts of the bulldirtg cede. (RI3ia7.9)
❑ 10 p CT INsT LEI:,: An ice barfier that consists of at least twa layers of 1
modified bitumen sheet w s " s and l
undortayment or of s selfdhertng p
extends le st m t e e' ed a to a point at leas _ in
ches inside the exterior
mmil line of the building. (8905,23.1) j
I
[' S�`;tLlC°d'U co ONEI�T9 A oUNDz ne structural roof components are
roof covering systern and the material and equipment bads
capable of supporGrtg the 1
that will be encourrtsred during installation of the roof covering system. �F,907.�)
� ' l~xisTi�1fE Was a�t:i�. -Existing roof covering was removed for one
of the reasons required by section t3�D7.
No R META 0. G: Existing vent flashing, metal edges, drain
outlets, collars or meal counter Clashing were not reinstalled IF rusted. 075)
F SHlttl 5T L.1. 99 RL'Y: Flashing shall be recoriatwctad in accardarw
with approved manufacturer=s tneisliation inSUMMons. Metal fleshing to which
bituminous materiels ere to be adhere shell be primed prior to installation. (119".6)
Signature of ary in
P staller
Dal
Signatu of Parrrfd bolder
{
i
i
i