Checkoff Sheet MS-2014-02790.tif • I
INTERNAT
CITY OF BLAIR REROOFING CH ECKOFF
Return to Blair City Half prior to Final Inspection
218 S i 6th Street, Blair, NE 68008
Because of limitations caused by the infeasibility to'perform detailed inspections which would
rk, please indicate compliance with the ;following requirements
not interfere with reroofing wo
f this reroofing job.
Permit #:
installation Date:
YES E NO
® ['� on used for recovering or replacing the existing
The materials and methods of applicati
roof covering comply with the requirements of the building code. (R907.1) _
OTECTION INSTALLED: An ice barrier that consists of at least two layers of
[ [CE PR of mer modified bitumen sheet was i� d and
underlayment or of a self - adhering p Y
extends m the eave's edge to a point at least 24 inches inside the exterior
at le_
wall line of the budding. (R905.2.7.1)
STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are euipment
a material and
capable of supporting the roof covering system e roof over ng systema(R907 z)loads
that Will encountered during installation of th ,
(NG COVERING WAS REMOVED: Existing roof covering was removed for one
of the reasons required by section R907.3
[� NO RUSTED IUIETAL OR FLASHING: Exisfi'ing vent flashi d t if n rusted �(R907 5) drai
outlets, collars or metal counter - flashing were not reinstall
i
FLASHING INSTALLED PROPERLY: Flashing shall be reco as ru t fia in a
with approved manufacturers installation instructions. Metal fl g
bite ous materials are to be adhered shall be primed prior to installation. (R907.6
Signature P ary Installer
Date
L �Dat - e
Sign a re of Permit Holder