Loading...
Checkoff Sheet MS-2014-02790.tif • I INTERNAT CITY OF BLAIR REROOFING CH ECKOFF Return to Blair City Half prior to Final Inspection 218 S i 6th Street, Blair, NE 68008 Because of limitations caused by the infeasibility to'perform detailed inspections which would rk, please indicate compliance with the ;following requirements not interfere with reroofing wo f this reroofing job. Permit #: installation Date: YES E NO ® ['� on used for recovering or replacing the existing The materials and methods of applicati roof covering comply with the requirements of the building code. (R907.1) _ OTECTION INSTALLED: An ice barrier that consists of at least two layers of [ [CE PR of mer modified bitumen sheet was i� d and underlayment or of a self - adhering p Y extends m the eave's edge to a point at least 24 inches inside the exterior at le_ wall line of the budding. (R905.2.7.1) STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are euipment a material and capable of supporting the roof covering system e roof over ng systema(R907 z)loads that Will encountered during installation of th , (NG COVERING WAS REMOVED: Existing roof covering was removed for one of the reasons required by section R907.3 [� NO RUSTED IUIETAL OR FLASHING: Exisfi'ing vent flashi d t if n rusted �(R907 5) drai outlets, collars or metal counter - flashing were not reinstall i FLASHING INSTALLED PROPERLY: Flashing shall be reco as ru t fia in a with approved manufacturers installation instructions. Metal fl g bite ous materials are to be adhered shall be primed prior to installation. (R907.6 Signature P ary Installer Date L �Dat - e Sign a re of Permit Holder