Loading...
Checkoff Sheet MS-2014-01465.tif 2009 INTERNATIONAL RESIDENTIAL CODE - CITY OF BLAIR IN CIS � SH ' Hall riot° to Final Inspection Return �® Blair clay p • 218 s 16 Street,. Blain, NE 66 008 i Because of limitations caused by the infeasibility to 'perform detailed inspections which would not interfere with reroofing work, please indicate compliance with the following requirements followfncl this reroofing job. Permit #: Installation Date: 4Z6�� YES NO The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (R907.1) ICE PROTECTION INSTALLED: An ice barrier that consists of at least two layers bf underlayment or of a self-adhering polymer modified bitumen sheet was installed and extends at lean from the eaye's edge to a point at least 24 inches inside the exterior wall line of the building. (R905.2.7.1) CTURAL COMPONENTS ARE SOUND. The structural roof components ar STRU e capable of supporting the roof covering system and the material and equipment loads th will be encountered during installation of the roof covering system. (R907.2) EXISTING COVERING WAS REMOVED: Existing roofcovering was removed for one of the reasons required by section R907.3 NO RUSTED METAL OR PLASHING: Existing vent flashing, metal edges, drain outlets, collars or metal counter-flashing were not reinstalled if rusted. (R907.5) PLASHING INSTALLED PROPERLY: Plashing shall be reconstructed in accordance with approved manufacturer's installation instructions. Metal flashing to which bitu ' ous materials are to be adhered shall be primed prior to installation. (R907.6) i Sig re o rirnary Installer Date ate Signature of Permit Holder