Checkoff Sheet MS-2014-01465.tif 2009 INTERNATIONAL RESIDENTIAL CODE -
CITY OF BLAIR IN CIS � SH
' Hall riot° to Final Inspection
Return �® Blair clay p •
218 s 16 Street,. Blain, NE 66 008
i
Because of limitations caused by the infeasibility to 'perform detailed inspections which would
not interfere with reroofing work, please indicate compliance with the following requirements
followfncl this reroofing job.
Permit #:
Installation Date: 4Z6��
YES NO
The materials and methods of application used for recovering or replacing the existing
roof covering comply with the requirements of the building code. (R907.1)
ICE PROTECTION INSTALLED: An ice barrier that consists of at least two layers bf
underlayment or of a self-adhering polymer modified bitumen sheet was installed and
extends at lean from the eaye's edge to a point at least 24 inches inside the exterior
wall line of the building. (R905.2.7.1)
CTURAL COMPONENTS ARE SOUND. The structural roof components ar
STRU e
capable of supporting the roof covering system and the material and equipment loads
th will be encountered during installation of the roof covering system. (R907.2)
EXISTING COVERING WAS REMOVED: Existing roofcovering was removed for one
of the reasons required by section R907.3
NO RUSTED METAL OR PLASHING: Existing vent flashing, metal edges, drain
outlets, collars or metal counter-flashing were not reinstalled if rusted. (R907.5)
PLASHING INSTALLED PROPERLY: Plashing shall be reconstructed in accordance
with approved manufacturer's installation instructions. Metal flashing to which
bitu ' ous materials are to be adhered shall be primed prior to installation. (R907.6)
i
Sig re o rirnary Installer Date
ate
Signature of Permit Holder