Loading...
Checkoff Sheet MS-2014-01463.tif 2009 INTERNATIONAL RES CODE - CITY OF BLAIR IN( CHE CKOFF H Return to Rlak City Hall' prior to Final Inspection 21 8 16 street, Blair, NE 68008 Because of limitations caused by the infeasibility to'perform detailed inspections which would not interfere with reroofing work, please indicate compliance with the following requirements followfing this reroofing job. Permit 9: e installation Date: YES NO The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (R907,1) ICE pROTEC 'ION INSTALLED: An ice barrier that consists of at least two layers bf underlayment or of a self-adhering polymer modified bitumen sheet was installed and ge extends at least from the eaye's ed to a paint at least 24 inches inside the exterior wall line of the building. (R905.2.7.1) [� STRUCTURAL. COMPONENTS ARE SOUND: The structural roof components are capable of supporting the roof covering system and the material and equipment loads that will be encountered during installation of the roof covering system. (8907.2) (� EXISTING COVERING WAS REMOVE D: Existing roof'covering was removed for one of the reasons required by section R907.3 [ No RUSTED METAL, OR PLASHING: Existing vent flashing, metal edges, drain outlets, collars or metal counter - flashing were not reinstalled if rusted. (R907.6) PLASHING INSTALLED PROPERLY. Plashing shall be reconstructed in accordance j with approved manufacturer's installation instructions. Metal flashing to which bituml us materials are to be adhered shall be primed prior to installation. (R907.6) Signature 4Primary Installer Date Date Signature of Permit Holder