Checkoff Sheet MS-2014-01463.tif 2009 INTERNATIONAL RES CODE -
CITY OF BLAIR IN( CHE CKOFF H
Return to Rlak City Hall' prior to Final Inspection
21 8 16 street, Blair, NE 68008
Because of limitations caused by the infeasibility to'perform detailed inspections which would
not interfere with reroofing work, please indicate compliance with the following requirements
followfing this reroofing job.
Permit 9: e
installation Date:
YES NO
The materials and methods of application used for recovering or replacing the existing
roof covering comply with the requirements of the building code. (R907,1)
ICE pROTEC 'ION INSTALLED: An ice barrier that consists of at least two layers bf
underlayment or of a self-adhering polymer modified bitumen sheet was installed and
ge
extends at least from the eaye's ed to a paint at least 24 inches inside the exterior
wall line of the building. (R905.2.7.1)
[� STRUCTURAL. COMPONENTS ARE SOUND: The structural roof components are
capable of supporting the roof covering system and the material and equipment loads
that will be encountered during installation of the roof covering system. (8907.2)
(� EXISTING COVERING WAS REMOVE D: Existing roof'covering was removed for one
of the reasons required by section R907.3
[ No RUSTED METAL, OR PLASHING: Existing vent flashing, metal edges, drain
outlets, collars or metal counter - flashing were not reinstalled if rusted. (R907.6)
PLASHING INSTALLED PROPERLY. Plashing shall be reconstructed in accordance j
with approved manufacturer's installation instructions. Metal flashing to which
bituml us materials are to be adhered shall be primed prior to installation. (R907.6)
Signature 4Primary Installer Date
Date
Signature of Permit Holder