Loading...
Checkoff Sheet MS-2014-01460.tif INTERNA RESIDENTIAL CODE - CITY OF . B AIR INL G CHE Return to Blair City Hale prior to Final lnspeCtion 218 S i 6 Street,. Blair, NB 68006 Because of limitations caused by the infeasibility to *perform detailed inspections which would i not interfere with reroofing work, please indicate compliance with the following requirements following this reroofing job. Permit #: Installation Date: YES NO The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (8907.1) ICE PROTECTION INSTALLED: An ice barrier that consists of at least two layers'of underlayment or of a self adhering polymer mo difiied bitumen sheet installed and extends at least from the eaye's edge to a point at least 24 inches inside the exterior wall line of the building. (R905.2.7.1) STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are capable 6f supporting the roof covering system and the material and equipment loads that will be encountered during installation of the roof covering system. (8907.2) EXISTING COVERIKG WAS REMOVED: Existing roofcovering was removed for one of the reasons required by section 8907.3 NO RUSTED METAL OR PLASHING% Existing vent flashing, metal edges, drain I outlets, collars or metal counter- flashing were not reinstalled if rusted. (8907.5) FLASHING INSTALLED pROpERLYc Flashing shall be reconstructed in accordance with approved manu fa c turers installation instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation. (R907.6) Signature o imary Installer to � Date Signature of Permit Holder I i