Checkoff Sheet MS-2014-01210.tif I NTERNATIONAL
CITY OF'BLAIR REROOFING
Return to Blair City Hall' prior to Final Inspection
218 s i6 Street,. Blair, NE 68008
Because of limitations caused by the infeasibility to'perform detailed insp ti requirements
econs wch would
not interfere with reroofing work, please indicate compliance with th e g
following this reroofing job.
Permit
Installation Date: ���
YES O
The materials and methods of application used for recovering or replacing the existing
roof covering comp y l with the r of the building code. (8907.1)
q
ICE PROTECTION INSTALLED: An ice barrier that consists of at least two layers of
underlayment or of a self - adhering polymer modified bitumen sheet was installed and
extends at least from the eave s edge to a point at least 24 inches inside the exterior
well line of the building. (R905.2.7.1)
Q STRUCTURAL COMPONENTS ARE SOUND: The structural � serial and equipment loads
capable of supporting the roof covering system an d t
that will be encountered during installation of the roof covering system. (R907.2)
I� EXISTING COVERING WAS REMOVED: Existing roof'covering was removed for one
of the reasons required by section R907.3
1
NO RUSTED METAL OR FLASH[NG: Existing vent flashing, metal edges, drain
outlets, collars or metal counter - flashing were not reinstalled if rusted. (8907.5)
FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance
with approved manufacturer's installation Instructions. Metal flashing to which
bituminous materials are to be adhered shall be primed prior to installation. (R907.6)
Z4
Signature of Primary Installer
Date
ignature 0 ermit older Dat