Loading...
Checkoff Sheet MS-2014-01048.tif i 2009 INTERNAI"IUNAL RESIDENTIAL (3UfflLJ CITY OF BLAIR Return to Blair City Hall prior to Final Inspection M S 'I6 Street, Blair, NE 68008 Because of limitations caused by the infeasibility to'perform detailed inspections which would not interfere with reroofing work, please indicate compliance with the following requirements following this reroofing job. Permit #. ,v 1113 WW IOGI� Installation Date: YE NO The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (R907.1) (� ICE PROTECTION INSTALLED: An ice barrier that consists of at least two layers of underlayment or of a self - adhering polymer modified bitumen sheet was installed and extends at least from the cave's edge to a point at least 24 inches inside the exterior wall line of the building. (R905.2.7.1) i STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are I capable of supporting the roof covering system and the material and equipment loads that will be encountered during installation of the roof covering system. (R907.2) I EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one of the reasons required by section R907.3 ® NO RUSTED METAL OR FLASHING: Existing vent flashing, metal edges, drain outlets, collars or metal counter - flashing were not reinstalled if rusted. (R907.5) FLASHING INSTALLED PROPERLY; Flashing shall be reconstructed in accordance with approved manufacturer's installation instructions. Metal flashing to which bi inous materials are to be adhered shall be primed prior to installation. (R907.6) Si g nature of Pri Installe Date �7 5 Date gnature o ermit Holder i i