Checkoff Sheet MS-2014-01048.tif i
2009 INTERNAI"IUNAL RESIDENTIAL (3UfflLJ
CITY OF BLAIR
Return to Blair City Hall prior to Final Inspection
M S 'I6 Street, Blair, NE 68008
Because of limitations caused by the infeasibility to'perform detailed inspections which would
not interfere with reroofing work, please indicate compliance with the following requirements
following this reroofing job.
Permit #.
,v 1113 WW IOGI�
Installation Date:
YE NO
The materials and methods of application used for recovering or replacing the existing
roof covering comply with the requirements of the building code. (R907.1)
(� ICE PROTECTION INSTALLED: An ice barrier that consists of at least two layers of
underlayment or of a self - adhering polymer modified bitumen sheet was installed and
extends at least from the cave's edge to a point at least 24 inches inside the exterior
wall line of the building. (R905.2.7.1)
i
STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are
I
capable of supporting the roof covering system and the material and equipment loads
that will be encountered during installation of the roof covering system. (R907.2)
I
EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one
of the reasons required by section R907.3
® NO RUSTED METAL OR FLASHING: Existing vent flashing, metal edges, drain
outlets, collars or metal counter - flashing were not reinstalled if rusted. (R907.5)
FLASHING INSTALLED PROPERLY; Flashing shall be reconstructed in accordance
with approved manufacturer's installation instructions. Metal flashing to which
bi inous materials are to be adhered shall be primed prior to installation. (R907.6)
Si g nature of Pri Installe Date
�7 5
Date
gnature o ermit Holder
i
i