Checkoff Sheet MS-2014-00876.tif 2009 INTERNATIONAL RESIDENTIAL CODE -
CITY OF B LAIR 1 �
Return to Blair City Hall prior to Final inspection j
218 S 16 Street, Blair, NE 68008
Because of (imitations caused by the infeasibility to'perform detailed inspections which would
not interfere with reroofing work, please indicate compliance with the following requirements
following this reroofing job.
Permit M 4 .
Installation Date:
YES No
The materials and methods of application used for recovering or replacing the existing
roof covering comply with the requirements of the building code. (R907.1)
ICE PROTECTION INSTALLED: An ice barrier that consists of at least two layers of
underlayment or of a self - adhering polymer modified bitumen sheet was installed and
extends at least from the cave's edge to a point at least 24 inches inside the exterior
wall line of the building. (R905.2.7.1)
Q STRUCTURAL COMPONENTS ARE SOUND: The struct terial and equipment loads
capable of supporting the roof covering system an d
that will be encountered during installation of the roof covering system. (R907.2)
® EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one
of the reasons required by section R907.3
I
NO RUSTED METAL OR FLASHING: Existing vent flashing, metal edges, drain
I
outlets, collars or metal counter - flashing were not reinstalled if rusted. (R907.5)
FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance
with approved manufacturer's ins #aUafiion instructions. Metal flashing to which
pP
bitu materials are to be adhered shall be primed prior to installation. (R907.6)
Signature of P 'mary installer D vte
Signature of Permit Holder Dat