Loading...
Checkoff Sheet MS-2014-00876.tif 2009 INTERNATIONAL RESIDENTIAL CODE - CITY OF B LAIR 1 � Return to Blair City Hall prior to Final inspection j 218 S 16 Street, Blair, NE 68008 Because of (imitations caused by the infeasibility to'perform detailed inspections which would not interfere with reroofing work, please indicate compliance with the following requirements following this reroofing job. Permit M 4 . Installation Date: YES No The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (R907.1) ICE PROTECTION INSTALLED: An ice barrier that consists of at least two layers of underlayment or of a self - adhering polymer modified bitumen sheet was installed and extends at least from the cave's edge to a point at least 24 inches inside the exterior wall line of the building. (R905.2.7.1) Q STRUCTURAL COMPONENTS ARE SOUND: The struct terial and equipment loads capable of supporting the roof covering system an d that will be encountered during installation of the roof covering system. (R907.2) ® EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one of the reasons required by section R907.3 I NO RUSTED METAL OR FLASHING: Existing vent flashing, metal edges, drain I outlets, collars or metal counter - flashing were not reinstalled if rusted. (R907.5) FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance with approved manufacturer's ins #aUafiion instructions. Metal flashing to which pP bitu materials are to be adhered shall be primed prior to installation. (R907.6) Signature of P 'mary installer D vte Signature of Permit Holder Dat