Loading...
Checkoff Sheet MS-2014-03346.tif 2009. INTERNATIONAL RESIDENTIAL CORE CITY OF 13LAIR RER'0OP1aG` kbF.F SH'Mfl Return to Blair City Hal pr[orr �a ��inal rnspec�ion 218 S 16 Street, Blair, NE 68008 Because of limitations caused by the infeasibility to perform 'detalled Inspections which would not interfere with reroofing work, please Indicate compliance with the following'requirements folloWi'M th reroofing )oh. Property 7 ('Zt 5% Address, Contractor or Homeowner (if self) : -" &5 P MS-2014- 6 33 12 Installation Date: YES 0 The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building coder (11907 :1) ICE PROTECTION INSTALLED An ice barrier that consists of at least two layers of underlayment or of a selfadhering polymer modified bitumen sheet was installed and extends at least from the'eave's'edge to a p 6int at least. 24 inches inside the 6deexferlor wall line of the building.�(RM5.2.7.1) . ,STRUCTURAL COMPO NTS ARE SOUND'. The structural roof components area capable of supporting the roof covering system and the materlal,a,nd e quipment loads that will be encountered during installation of the, roof covering system. (R907.2) EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one of the reasons required by section R907.3 DID NOT USE RUSTED METAL OR FLASHING:. Existing vent flashing; metal edges, drain outlets, coliars metal counter flashing were not, reinstalled, if rusted (8907.5} FLASHING INSTALLED PROPEI LY. `Flashing shall be reconstructed in accordance with approv1od manufacturer's° installatiop Instructions:.Me'tal flashing to which bituminous materials are to be adhered shall be primed prior to installation. (11907.6) Sig atur rim Instal VA atur der' Date