Checkoff Sheet MS-2014-03346.tif 2009. INTERNATIONAL RESIDENTIAL CORE
CITY OF 13LAIR RER'0OP1aG` kbF.F SH'Mfl
Return to Blair City Hal pr[orr �a ��inal rnspec�ion
218 S 16 Street, Blair, NE 68008
Because of limitations caused by the infeasibility to perform 'detalled Inspections which would
not interfere with reroofing work, please Indicate compliance with the following'requirements
folloWi'M th reroofing )oh.
Property 7 ('Zt 5%
Address,
Contractor or Homeowner (if self) : -" &5
P MS-2014- 6 33 12
Installation Date:
YES 0
The materials and methods of application used for recovering or replacing the existing
roof covering comply with the requirements of the building coder (11907 :1)
ICE PROTECTION INSTALLED An ice barrier that consists of at least two layers of
underlayment or of a selfadhering polymer modified bitumen sheet was installed and
extends at least from the'eave's'edge to a p 6int at least. 24 inches inside the 6deexferlor
wall line of the building.�(RM5.2.7.1) .
,STRUCTURAL COMPO NTS ARE SOUND'. The structural roof components area
capable of supporting the roof covering system and the materlal,a,nd e quipment loads
that will be encountered during installation of the, roof covering system. (R907.2)
EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one
of the reasons required by section R907.3
DID NOT USE RUSTED METAL OR FLASHING:. Existing vent flashing; metal edges,
drain outlets, coliars metal counter flashing were not, reinstalled, if rusted (8907.5}
FLASHING INSTALLED PROPEI LY. `Flashing shall be reconstructed in accordance
with approv1od manufacturer's° installatiop Instructions:.Me'tal flashing to which
bituminous materials are to be adhered shall be primed prior to installation. (11907.6)
Sig atur rim Instal VA
atur
der'
Date