Loading...
Checkoff Sheet MS-2014-03338.tif 2009 INTERNATIONAL RESIDENTIAL CODE CITY. OF BLAIR REROOFWG CHECKO SHEET Return to Blair City Hall prior to Final Inspection 218 S 16 th Street, Blair, NE 68008 Because of limitations caused by the infeasibility to perform detal led Inspections which would Li-o_t interfere with reroofing work, please indicate compliance with the following requirements fbII2AfLng this reroofing job. I F Property Address: Contractor or Homeowner (if self) Permit#: MS-2014- Installation Date: YES 0 The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code I . ( R907A) 13 ICE PROTECTION INSTALLED - : An lee barrier that consists of at least two layers of flayment or of a self-adhering polymer modified bitumen sheet was installed and extends at least from the eaves edge to -a point at least 24 inches inside the exterior wall line of the building. (R805.2.7.1) STRUCTURAL COMPO ARE SOUND: The structural roof components are capable of supporting the roof covering syste and the material and equipment loads that will be encountered during installation of the roof covering system. (8907.2) EXISTING COVERING WAS REMOVEM Existing roof covering was removed for one of the reasons required by section R907.3 DID NOT USE RUSTED METAL OR FLASHING: Existing vent flashing, metal edges, drain outlets, collars or metal counter - flashing ware not reinstalled if rusted. (8907.5) PLASHING INSTALLED PROPERLY Plashing shall be reconstructed In accordance with approved manufacturer's installation instructlions. Metal flashing to which bituminous Materials are to be adhered shall be primed prior to installation. (R907.6), rat re ri ary In - 'alle Date " ure f Permit older Date - - - -- -----------