Loading...
Checkoff Sheet MS-2014-03334.tif I 2 i RESIDEN j SHEET R eturn , to Blair City H all rior16f l 'In pectloft . 218 S 16 h Street, Blair, NE 66006 Because of Limitations caused by the Infeasibility to perform detailed Inspections which would riot interfere with reroofing work, please Indicate compliance with the following 'requ repients followinet this reroofing job. Property Address:. Contractor or Homeowner {if self} Permit #s 14 lnstalIatio D t y g� The materials and methods of application used fpr recovering or replacing the existing roof covering comply with the requirements of the building coda. (R907:1). ICE PROTECTION INSTALLED An ice barrier that consists of at least two layers of underlayment or of a self - adhering polymer modified bitumen sheet was Installed and extends at least from the eave's'edae to a point at least 24 inches inside the exterior wall line of the building, (8905.2,7.1) l L STRUCTURAL COMPONENTS ARE SOUND'. The structural roof components are capable of supporting the roof covering system and the material,and equipment loads that will be encountered during Installation of the roof covering system. ` {R907.2) EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one. of the reasons required by section R907,3 DID NOT USE RUSTED METAL OR PI;A f HINC: Existing vent lashln meta e d g es, E � g f g� l es 0, drain outl"ets,, collars or metal counter-flashing were not reinstalled if rusted. (8907,5) FLASHING INSTALLED PROPERLY ¢ Flashing shall be reconstructed 1n accordance with approved"r6anufaeureesa installatiop Instructions - .NietaI flashing to which bituminous materials are to be adhered shall be primed priorto installation. (R907.8) a ur" of rim ler Data not of Permit Holder �' Date _ i