Loading...
Checkoff Sheet MS-2014-01813.tif i I 02/09/2015 14:26 4025720154 UNITED SERVICES PAGE 02/02 CITY OF B Return to Iair i Hall prior to Einar inspection 1 8 1 tre0t lair, NE 68008 Because of limitations caused by the Infeasibility t? perform detailed Inspections which would not interfere with reroofing work, please indicate compliance with the folloVing requirements followigg this reroofing job. Property Addrese' a W V [ � Contractor or Homeowner (if self) : �' l Rrll[�. ' _qC hermit #: WI 201 4 &- Installation Date:iC1� YES NO I The materials and m ethods of application used fo r recovering or r eplacing the exist roof covering comply with the requirements of'the building. code. (RO67.1) ICE PR0TEDTI0N INSTALLED An ice barrier that consists of at least two layets Of underlayrripm or of a,. adheri polymer mudiflecl bitun�e�i shoet way ins l and extends at least Pram the eave's e dge to a pc?int gat least 24' iri6hes inside the exterior wall line of the building. (R9O5.2:7.1) ' STRUCTURAL COMPONENTS ARE SOUND: The struct roof components are oapable of supportind the ;roof covering systerri and the'materlal.and equipment toads that will be encountered during in §tallstion of the roof covering system. (11907.2) L� EXISTING COVERING .WAS REMOVED:, Existing. roof covering was- removed for one of the-reasons .rego1r6d.by R9073'.. Die NOT USE RUa'TED I l B IN Existing -v6dt flaWrig,:mefal edges, drain outlets, dollars bt met $'[ -coanter4la;shirig' werd not reirietalled if rusted. (8907.6) [ FLASHING INSTALLED PROPER Flashing shall be reconstructed, in accordance with approved manufacturer's installation instructions. Metal flashing to which bituminous materials are to be adhered shall be printed prior to installation. (11907.6) igna ure of Primary Installer ate �Icg re of hermit Holder ate Pefffli� MWA (JL� S'll IM GcAko" VAMICA