Loading...
Checkoff Sheet MS-2014-00536.tif i i i 02/0912015 14:26 4025720154 UNITED SERVICES PAGE 01/02 N I TWOF BLAIR RE Return to Blair City Hall prier to Final insp ctio 218 S 1 6 th Street, Blair, NE 68008 Because of limitations caused by the Infeasibility to perform detailed inspections which would not interfere with reroofing work, please inchoate compliance with 'the following requiremonts following this reroofing job. Property Address: C7t Contractor ar Homeowner (if s elf) : n2 iw'(t Permit #: WIS-20 4- rk Installation Date-. YES NO The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (8907.1) I� ICE PROTECTION INSTALLED An ice barrier that con sists of at bast two layers of underlayment or of a self - adhering polymer modified bitumen sheet was.installed and extends at least from the eave °s edge to a point least 24. inches in a the exterior wall line ofthe.building. (890527,11) STRUCTURAL COMPONENTS ARE SOgNtf: The struatural components are capable of supporting the roof. covering system and the materWI and equipment loads that will be encountered during installation of the roof doveririg system. (R907.2) EXISTING COVERING WAS RE111I.O1 ED*4 .Existln.g: rppf covering was removed for one 010 NOT USE RUSTED METAL OR PLASHING: Existing v6nt fla; §hing,:metal edges, drain outlists collars or metal counter flash l.hg Were riot reiinstailed if rusted, (R907�5) I Q FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance with approved manufacturer's installation instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation. (8907.6) Signs ure of Primary Installer ate A,, I, Alh A S(gna re of Perrr�lt'Hoalder ate kn� d ° (P f 95 1 - We &l y