Checkoff Sheet MS-2014-00506.tif INTERNA TIONAL RESIDENTIAL CODE -
CITY OF BLAIR REROOFING CHECKOFF SHEET
Return to Blair city Hail prior to Final inspectio
218 S le Street, Blair, CIE 88008
Because of Limitations caused by the infeasibility to perform de ailed i n 1p ectio requirements
not interfere with reroofing work please indicate compliance
foliowlng this reroofing job.
Permit M.
i
installation Date: — -
17
YES NO
I ../, 0 The materials and methods of application used for recovering or replacing the existing
f roof covering comply with the requirements of the building code. (R907.
ICE PI'0 ECTLON II�ISTALLEi]: An lee barrier that consists of at least two layers of
underlayment o r of a self adhering polymer modified bitumen sheet was 1_ ns #ailed and
extends at least from the eave's ed a to a point at Least 24 inches inside the exterior
wall line of the building. (R905.2.7.'I)
CJ STRUCTURAL. C OMPONENTS ARE SOUND: The structural roof com u 'p o mea lo
e material and eq ads
capable of supporting the roof covering system and tY�
that will be encountered during installati on of the roof covering system. (R9g7
® EXISTING COVERLNG l+I1wAS REMOVE: Existing roof covering was removed for one
of the reasons required by section 8907.3
NO L�.USTED IVIE�'AL- Cti� u� es were g n t flashing, metal
if rusted. drain
outlets, collars or metal co (R907. )
FLASl LNG INSTALLER pROPERL.Y: Flashing shall be reconstructed in accordance
with approved manufacturers installation instructions. Metal flashing o installat (11907.6) .6}
bituminous materials are to be adhered shall be primed prior
Signature of Primary installer
Date
1
,. . ate
ign�ture of Permit Holder
8'd 09Z96s8 -zov sous }xE] 8}9jdW00 dt,9:Z046LOgaj