Loading...
Checkoff Sheet MS-2014-00506.tif INTERNA TIONAL RESIDENTIAL CODE - CITY OF BLAIR REROOFING CHECKOFF SHEET Return to Blair city Hail prior to Final inspectio 218 S le Street, Blair, CIE 88008 Because of Limitations caused by the infeasibility to perform de ailed i n 1p ectio requirements not interfere with reroofing work please indicate compliance foliowlng this reroofing job. Permit M. i installation Date: — - 17 YES NO I ../, 0 The materials and methods of application used for recovering or replacing the existing f roof covering comply with the requirements of the building code. (R907. ICE PI'0 ECTLON II�ISTALLEi]: An lee barrier that consists of at least two layers of underlayment o r of a self adhering polymer modified bitumen sheet was 1_ ns #ailed and extends at least from the eave's ed a to a point at Least 24 inches inside the exterior wall line of the building. (R905.2.7.'I) CJ STRUCTURAL. C OMPONENTS ARE SOUND: The structural roof com u 'p o mea lo e material and eq ads capable of supporting the roof covering system and tY� that will be encountered during installati on of the roof covering system. (R9g7 ® EXISTING COVERLNG l+I1wAS REMOVE: Existing roof covering was removed for one of the reasons required by section 8907.3 NO L�.USTED IVIE�'AL- Cti� u� es were g n t flashing, metal if rusted. drain outlets, collars or metal co (R907. ) FLASl LNG INSTALLER pROPERL.Y: Flashing shall be reconstructed in accordance with approved manufacturers installation instructions. Metal flashing o installat (11907.6) .6} bituminous materials are to be adhered shall be primed prior Signature of Primary installer Date 1 ,. . ate ign�ture of Permit Holder 8'd 09Z96s8 -zov sous }xE] 8}9jdW00 dt,9:Z046LOgaj