Loading...
Checkoff Sheet MS-2014-00504.tif �`! N L RESIDEN as ANT I, CITY OF BLAIR REROOFING CHECKOFF SHEET Return to Blair City Hall' prior to Final Inspection 218 S 16 Street, Blair, HE 68008 Because of limitations caused by th eae n d cats aomp>sian e d eta il ed the requirernents not interfere with reroofing work, pi se foliowin this reroofing job. Permit #'�°�� Installation Date: YES NO n used for recovering or replacing the existing The materials and methods of applicatio roof covering comply with the requirements of the building code. (R907.1) ICE FROl ECG IQN INS TA1l EC : An ice barrier that conststs of at least two layers of underlayment or of a self - adhering polymer modified bitumen sheet was i� nstail�d and extends at least from the Rave's ed a to a point at least 24 inches inside the extennr wall line of the building. (8905.2.7.1) STRUCTURAL cOMPONERTS ARE SOUND: The structural roof components are capable of supporting the roof covering system and the material and equipment loads that will be encountered during installation of the roof covering system. (R907.2) [� EKi5TiN0 COVERING WAS REMOVED: Existing roof covering was removed for one of the reasons required by section R907.3 NO RUSTED METAL OR PLagt{iNQ: Existing vent flashing, metal edges, drain outlets, collars or metal counter - flashing were not reinstalled if rusted. (R907.5) shall be reconstructed in accordance [� FLASHING INSTALLED P'RQi'1"RI.Y. Flashing _ s. illiefal flashing to which with a roved manufacturers installation instruct€on installation. (R9QT.6) pp bituminous materials are to be adhered shall be primed prior t o i � Signature of Primary installer Date ign tore of Permit Holder 6'd o9Z96E£ - Zot a e}eldwoC) dtq:Zo56 Lo qezl i