Checkoff Sheet MS-2014-00490.tif i
I
- 0' RESIDENTIAL CODE -
2009 INTERNAft ROOFING CHECKOFF SHEET
CITY OF BLAIR RE Return to Flair city Hall prior to Final Inspection
218S I1 Street Blair, NE 68008
Because of limitations caused by the infeasibiiitY to perform detailed inspections which would
not interfere with reroofing work, please indicate compliance with the following requirements
following this reroofing lob. C
Permit #"
Installation Data =
I
YES NO
L-f C3 The materials and methods of application used for recovering or replacing the existing
roof covering comply with the requirements of the building code. (R9D7. I)
y ® ICE I&OTEC310 iq IN :ALLED: An ice barrier that consists of at least two layers of
uneierlayment or of a self - adhering polymer modified bitumen sheet was installed and
extends at least from the eaves to a point at least 24 inches inside the exterior
wall line of the building. (R9a5.2.7.9)
ST R JCTUFtAL COMPONENTS ARE SOUND: The structural roof components are
capable of supporting the roof covering system and the material and equipment loads
that will be encountered during installation of the roof covering system. (8907.2)
EXISTING COHERING WAS REMOVED: Existing roof covering was removed for one
of the reasons required by section 11907.3
r. ( Na RUSTED t1fIETAi. OR FLASHING: Existing vent flashing, metal edges, drain
outlets, collars or metal counter flashing were not reinstalled if rusted. (11997.5)
FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance
E '
with approved manufacturers installation instructi r i m Metal I to i n sta lation.
pp 11997.6)
bituminous materials are to be adhered shall be primed prior to
Signature of Primary Installer
Date
Dat
- ign Lure of Permit Holder
Z - d 09Z96££-ZOt a01ae1x3 9191dwoC) dL9:Z096LOge3
i
i