Loading...
Checkoff Sheet MS-2014-00490.tif i I - 0' RESIDENTIAL CODE - 2009 INTERNAft ROOFING CHECKOFF SHEET CITY OF BLAIR RE Return to Flair city Hall prior to Final Inspection 218S I1 Street Blair, NE 68008 Because of limitations caused by the infeasibiiitY to perform detailed inspections which would not interfere with reroofing work, please indicate compliance with the following requirements following this reroofing lob. C Permit #" Installation Data = I YES NO L-f C3 The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (R9D7. I) y ® ICE I&OTEC310 iq IN :ALLED: An ice barrier that consists of at least two layers of uneierlayment or of a self - adhering polymer modified bitumen sheet was installed and extends at least from the eaves to a point at least 24 inches inside the exterior wall line of the building. (R9a5.2.7.9) ST R JCTUFtAL COMPONENTS ARE SOUND: The structural roof components are capable of supporting the roof covering system and the material and equipment loads that will be encountered during installation of the roof covering system. (8907.2) EXISTING COHERING WAS REMOVED: Existing roof covering was removed for one of the reasons required by section 11907.3 r. ( Na RUSTED t1fIETAi. OR FLASHING: Existing vent flashing, metal edges, drain outlets, collars or metal counter flashing were not reinstalled if rusted. (11997.5) FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance E ' with approved manufacturers installation instructi r i m Metal I to i n sta lation. pp 11997.6) bituminous materials are to be adhered shall be primed prior to Signature of Primary Installer Date Dat - ign Lure of Permit Holder Z - d 09Z96££-ZOt a01ae1x3 9191dwoC) dL9:Z096LOge3 i i