Loading...
Checkoff Sheet MS-2014-00361.tif i NAL RESIDENTIAL CODE 2009 INTERNATIO CITY OF BLAIR REROOFING CHECKOFF SHEET Return to B14ir City [alt' prior to final inspection 218 S 16 Street, Blair, NE 68008 Because of limitations caused by the infeasibility to perfor et died i f requirer3nentsd trot interfere with reroofing work, please Indicate com pliance with k4muim this reroofing job. j Permit #• _ I `-'— Installation Date. YES NO The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code, (R907.1) ,- ICE PROTECTION INSTALLEU An ice barrier that consists of at least two layers of underlayment or of a self - adhering polymer modified bitumen sheet was installed and extends at least ftom the eave's ed a to a point at least 24 inches inside the exterlor i wail line of the building. (R9G5.zJJ) STRUCTURAL CQMPOIVEWS ARE SOUND: The structural roof components are capable of supporting the roof covering system and the material and equipment loads that will be encountered during installation of the roof covering system. (R9o7.2) EKI S T ING COVERING WAS REMOVED: Existing roof covering was removed for one ® of the reasons required by section R907.3 .� NtJ RUSTED ME TAI.OR FLASHING: Existing vent flashing, metal edges, drain outlets, collars or metal counter-flashing were not reinstalled if rusted. (11997,5) FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance with approved manufacturer's installation instructions• Metalflash R907.�} bituminous materials are to be adhered shall be primed error to inst. Signature of Primary Installer Da Date t " of it Ho Permlder I I t,'d o9Z96££ a e}eldwoo d Lg:Zo 91, Lo qe:1 I � I