Loading...
Checkoff Sheet MS-2014-00359.tif i I RESIDENTIA 009IN'TERNA TI N I� l -IFFY O CITY BLA IR RER�I CHE ctirn Return to Blair Cit Wall prim to Anal inspe 218 S 16 street, Blair, NE 68408 � 'ante with the fallowi not interfere with reroofing requiremens Because of llrnitatians caus e indicate comp ed by the infeasibiility to perform detailed inspections which woul Eec g leas work, P f2ll2win this reroofing job. 3_ Permit #: g g s: aa �- —_ _-_ ---. installation Date'. YES recovering o r replacing the existing The materials and methods of application used for reca g roof covering comply with the requirements of the building code. (8907.9) I ,�' ICE pROTECTIOI INSTALLED An ice barrier that 4 sheet was installed and of mer m odified bitumen underlayment or of a self - adhering la y point at least 24 inches inside the exterior extends a t least from the eave's edge to a wall line of the buy building. . (8905.2.7.1) ST RtlC'TURAL COMPONENTS ARE SO s em and the material and qu equ loads capable of supporting the roof covering y s stern. (R.907• that will be encountered during installation of the roof covering y EXISTING G011ERlNG WAS REMOVE D: Existing roof covering was removed for one i of the reasons required by section R9g7. L1 No BUSTED METAL OR F NG: E pie e vent re installed +if metal edges, rusted. (R907.5) d rain outlets, collars or metal counter flashing t= LASHING 1NSSALLE ®piOpEFtLY; Flash l Metal flashing o which acc ordance with approved marnufacturer's installation ins e rimed prior to installation. (8907.6) bituminous materials are to be adhered shall p Date Signature of Primary installer ate ign' ure of Permit Holder d aoiae}v� e}e�dwoC) dZ9:Z09 LOged 9' 0929 L ££ I