Checkoff Sheet MS-2014-00359.tif i
I
RESIDENTIA
009IN'TERNA TI N I� l -IFFY
O
CITY BLA IR RER�I CHE ctirn
Return to Blair Cit Wall prim to Anal inspe
218 S 16 street, Blair, NE 68408 �
'ante with the fallowi
not interfere with reroofing requiremens
Because of llrnitatians caus e indicate comp ed by the infeasibiility to perform detailed inspections which woul
Eec g leas work, P
f2ll2win this reroofing job.
3_
Permit #: g g s: aa �- —_ _-_ ---.
installation Date'.
YES recovering o r replacing the existing
The materials and methods of application used for reca g
roof covering comply with the requirements of the building code. (8907.9)
I
,�'
ICE pROTECTIOI INSTALLED An ice barrier that 4 sheet was installed and
of mer m odified bitumen
underlayment or of a self - adhering la y point at least 24 inches inside the exterior
extends a t least from the eave's edge to a
wall line of the buy building. . (8905.2.7.1)
ST RtlC'TURAL COMPONENTS ARE SO s em and the material and qu equ loads
capable of supporting the roof covering y s stern. (R.907•
that will be encountered during installation of the roof covering y
EXISTING G011ERlNG WAS REMOVE D: Existing roof covering was removed for one i
of the reasons required by section R9g7.
L1 No BUSTED METAL OR F NG: E pie e vent re installed +if metal edges, rusted. (R907.5) d rain
outlets, collars or metal counter flashing
t= LASHING 1NSSALLE ®piOpEFtLY; Flash l Metal flashing o which acc ordance
with approved marnufacturer's installation ins e rimed prior to installation. (8907.6)
bituminous materials are to be adhered shall p
Date
Signature of Primary installer
ate
ign' ure of Permit Holder
d aoiae}v� e}e�dwoC) dZ9:Z09 LOged
9' 0929 L ££ I