Loading...
Checkoff Sheet MS-2014-00357.tif i i 2009 INTERNATIONAL RESIDENTIAL CODE - CITY OF BLAIR REROOFING CHECKOFF S HEET Return to Blair city Half prior to Final inspection i 18 S ie street, Blailr NB aused by the infeasibility to perform detailed inspections which would Because of limitations c work, please indicate compliance with the fallowing requirements not interfere with reroofing faliowin this reroofing job. Permit #. » i instailation Gate: YES N© The materials and methods of application used for recovering or replacing the existing roof covering com with the requirements of the building code. (R907J) ICE PROTEGTLQN INSTALL -ED: An ice barrier ed bitumen sheetw was installed and underlayment or of aself- adhering po l ym er modi f� inches inside the exterior extends at least from the eaves edge to a p oint at least 24 wall line of the building. (R905.21.1) STEttiCTURAb. COMPONENTS ARE SOU em and the material and e quipment loads ' capable of supporting the roof covering Y s stern. (8907.2) that will be encountered during installation of the roof covering y G WAS REMOVED: EJti T1NG COVERIN Existing roof covering was removed for one I of the reasons required by section R907.3 metal edges, drain NO RUSTED METAL PLASHING: Existing ere not reIn tailed flashing, metal rusted. (8907.5) outlets, collars or t�tetal counter filashing FLASHii`IG 1l�lSTALLEQ pRQpERtY; Fla Metal flashing o wbi recon structed in with approved manufacturers installation bituminous materials are to be adhered shall be primed prior to installation. (R907.6) ! pate Signature of Primary Installer r ` i ate ign ` ure of Permit Holder L - d 0929 L9£ °Z0V 1 e}eldwoo d09:Z0 9 LO gezj