Loading...
Checkoff Sheet MS-2015-00050.tif i C L RESIDENTIAL CODE C ITY OF BLAIR REROOFI R eturn to Blair Cit H a ll prior to Final Inspection 18 S 16 St r eet, B lair, NE 68008 Because of limitations caused by the Infeasibility to perform detailed inspections which would not interfere with reroofing work, please indi ate compliance with the following requirements following_ this reroofing job. Property Address: M Contractor or Homeowner if sel : tJ Permit #: MS-201 5. - 00050 I j Installation Date: YES NO The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (R907.1) 1 , ICE PROTECTION INSTALLED An ice barrier that consists of at least two layers of underlayment or of a self- adherincd' polymer modified bitumen sheet was installed and extends at least from the eave's edge to a point at least 24 inches inside the exterior wall line of the building. (R905.2.7"1) STRUCTURAL COMPONENTS ARE SOUND* The structural roof components are capable of supporting the roof covering system and the material and equipment loads that will be encountered during installation of the roof covering system. (8907.2) EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one of the reasons required by sectionR907.3 I DID NOT USE RUSTED 'METAL O R FLASHING: Existing vent flashing, metal edges, drain outlets, collars or metal counter- flashing were not reinstalled if rusted. (8907.5) FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance with approved manufacturer's installation instructions. Metal flashing to which bitumino s materials are to be adhered shall be primed prior to installation. (R907.6) { -L4-1-5 Sig to e�of lma I 'staller _ Dates t � _ )-5 Signa r o ftHolder Date I i