Loading...
Checkoff Sheet MS-2014-02201.tif i 02/05/2015 13:13 7790112 GOEUEN CONSTRUCTION PAGE 02 20"09 INTERNATI ONAL RESIDENTIAL CODE CITY OF BLAIR REROOFING CHECKOFF SHEET R eturn to Blair City Hall prior to Final' Inspection 21 S 18 th Street, glair, N 68008 Because of limitations caused by the Infeasibility to perform detailed inspections which would Interfere with reroofing work, please Indicate compliance with the following requirements L9JLo—wJn this reroofing job. Property Address: I Contractor or Homeowner (if self) Permit f#, -2"4` Installation Date: YES AO The materials and methods of application used for recovering or replacing the existing roof covering pomply with the requirements of the building code. (R907.'1) ' I ICE P QTEDTI N ALE INSTA EC1 An ice barrier that consists of at least two layers of j underlayment or of a self - adhering polymer modified bitumen sheet was installed and extends a least fro,�e eave's edge to a point at least 24 inches inside the exterior wall line of the building. (R905.2.7.1) §TRUCT RA COMPQNENTS ARE SOUND: The structural roof com mp is era . capable of supporting the roof covering system and the material and equipment loads that will be encountered during installation of the roof covering system. (8907.2) EXISTING COVERING WAS REMOVE[% Existing roof covering was removed for one of the reasons required by section R907.3 DID NOT USE Ft9 §TEQ METAL OR FLASHING: Existing vent flashing, metal edges, drain outlets, collars or metal counter- flashing were not reinstalled if rusted. (R907.5) i FLASHING NG INSTALLED PROPERLY Flashing shall be reconstructed in accordance with approved manufacturer's installation instructions. Metal flashing to which bituminous materials ara to be adhered shall be primed prior to installation. (R907.5) Signature tofar installer Date signature Hoiden ps,t,a I