Loading...
Checkoff Sheet MS-2014-02202.tif i i 'L i 02/05/2015 13:13 7790112 GOEDEN CONSTRUCTION PAGE 01 I NFERNATIONAL RESIDENTIAL CODE - SHEE CITY OF BLAIR REROOFING CHECKOFF Return to Blair City Hall' prior to Anal Inspection 18 16 Street, Blair{, ldlb 68008 aseguee of 11mlfaflons caused by the Infeaslblilfy to'perform detailed inspections which would RcA Interfere with reroofing work, please Indicate~ compliance with the following requiremsnta f2ll�wfng this reroofing )ob. Permit MA � � Y �2 2 42 Q a installation Date: Yes AO The materials and methods of application used for recovering or replacing the existing roof covoring comply with the requirements of the building code. (8907.1) CE R G IO MULLED: ED: An Ice barrier that consists of at least two layers of underlaymsnt or of a self- adhering polymer modified bitumen sheet was Installed and extends at least from the eaye's edoe to a point et feast 241rnchas lnslde the exterior wall line of the building. (R906.2.7.1) S CQMPORNTS ARIASOL) D: The structural roof components are capable df supporting the roof covering system and the material and equipment loads that will be encountered during Inatallat[on of the roof colleting system, (8907.2) EXISTINQ 69y E,RIag WAS R'F-MOVED; Existing roof covering was removed for one of the reasons required by section 8907.3 ( NO BQ8TgP tt F S 1NG: Existing vent flashing, metal edges, drain outiete, cc[iars or metal counter-flashing were not reinstalled If rusted. (R 907.5 ) F1rAS IP+IC 1lVS'l`AI,� D l'ELOPE ` : Flashing shall be reconstructed to accordance with approved manufacturer's installation Instructions. Metal fleshing to which bituminous rnatedals are to be adhered smell be pruned prior to Installation. (11947.6) Slgnatu ary Installer s ate I Signature ermit Mulder Gate I i I I I