Loading...
Checkoff Sheet MS-2014-00994.tif i 02/05/2015 13:13 7790112 GOEDEN CONSTRUCTION PAGE 03 RES IL n 2009 INTERNATIONAL Re turn to B lair City Hall prior to Final inspection 218 S 16th Street, Blair, NE 68008 Because of limitations caused by the Infeasibility to perform detailed inspections which would riot interfere with reroofing work, please indicate compliance with the following requirements W ft h ln-g this reroofing )ob. PrOPOrty Address ; Contractor or Homeowner (if self) ; (permit #: MS-20 - Do t9 Installation Date: / YES NO The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code, (8907.1) WE — PR OTECTION IN TALLER An ice barrier that onsi c its of at least two layers of underlayment or of a self- adhering polymer modified bitumen sheet was installed and extends at least from the eave's edge to a point at least 24 inches inside the exterior wall line of the building. (R905.2.7.1) S'li R C + 1.1_. Tt�JRAL OMPQNENTS ARE SOUND: The structural roof components are capable of supporting the roof covering system and the material and equipment loads that will be encountered during installation of the roof covering system. (11907.2) EXISTING COVERING WAS REMOVE13: Existing roof covering was removed for one of the reasons required by section 8907.3 DID NOT USE RUSTED METAL- O R FLASHING: Existing vent flashing, metal edger., drain outlets, collars or metal counter - flashing were not reinstalled if rusted. (8907.5) FL.ASIJING iNS"if°A1 LEI2 PROPEL t Y: Flashing shall be reconstructed in accordance with approved manufacturer's installation instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation. (8007.0) Signet a of In ry i taller bate T Signature o ermit Holder at .: „ twa I