Checkoff Sheet MS-2014-03359.tif 2009 INTERNATION"AL RESIDENTIAL COD
CITY OF BLAIR REROOFIKG CHECKO'FF SHEET
Return to Blair City Hell prior t6 Final Inspection �
218 S 16th Street, Blair, NE 08000
Because of limitations caused by the infeasibility to perform detailed inspections which would
not interfere with reroofing work, please Indicate compllance with the fallowing requirements
fo l l ^, °....Ainrd this reroofing j ob. '
i
Property Address:
Contractor or Homeowner (if sel�
Permit #! MS -2014w
Installation Date.
YE NO
. The materials and methods of application used for recovering or repla(�Ing the existing
roof covering comply with the requirements of the building code'. (1'907A)
ICI; PROTECTION INSTALLED: An ice harrier that consists of at least two layers of
underlayment or of a self adhering polymer modified bitumen sheet was installed and
6xtenda at least from the eave's ed a to -a point at least 24 inches inside the exterior
wall line of the building. (8905.2.7.1)
STRUC COMPONENTS ARE SOUNU: The struotural roof components are r
capable of supporting the roof covering system and the material 4 d equipment loads
that will be encountered during installation of the roof covering system. (R007.2)
EXISTING COVERING WAS RP- MOVED: Existing roof cover was removed for one
of the reasons required by section R907.0
DID NOT USE RU Ti BD METAL OR FLASHING: Existing vent flashing, meW edges,
drain uutCets, colittra or metal counter- flashing wore not rainstalled if rusted. (R907.5)
FLASH INSTALLED PROPP - PLY: Flashing shall be reconstructed in accordance
with approved manuf'acturer's installatiop Instructions. Metal flashing to which
bituminous materials o be adhered shall be primed prlor to installation. (8907.6)
ignat e f ary In� e Date
si afore of Permit Hol er D