Loading...
Checkoff Sheet MS-2014-02986.tif MHK db - c!UU�-J eJ:t>b From: 10: 4/ 8 20 INTERNATO"'IYAL K`0`3 CODE CITY OF BLAIR REROOFING CHECKOFF SHEET Rbturn to B lair Cit Hall prior to Fin Inspection 1 1 tireet, Emair,'NE 6800 Because of limitations caused by the infeasibility to perform detailed inspectlons which would no interfere with reroofing work, please Indicate compliance with'the fallowing requirements fallowing #his reroofing job. Property Address: Contractor or Ha eowner (if self) Permit #: MS- 2014- 02, f InstallAtion late: T YE NO The materiels and methods of application used for recovering 'or replacing the existing roof covering comply with the requirements of the building code. (11907,1) ICE PROTECTION INSTALLED: An ice barrier that consists of at least two layers of underlayme'nt or of a self-adhering polymer modified bitumen sheet was installed and extends at least from the eave's edge to a point at least 24 inches Inside the exterior wall line of the building. (8905,2,7.1) STRUCTURAL COMPONE 4TS ARE SOUND: The struotural roof comp onents are capable of supporting the roof covering system and the material and equipment loads that will be encountered daring installation of the roof covering system. (R907.2) rzXISTIN% COVERING WAS REMOVED: Existing roof covering was removed for one � of the reasons required by sectlo 8907.3 � DID NOT USE RUSTED METAL OR FLASHING: Existing vent flashlhg metal ed e drain outlets, collars or metal counter - flashing were not reinstallEid if rusted. (11907-5) FLASHING INSTALLED PRQPEF*L'Y: Flashing shall be recon structed with approved manuf'acturer's installation instructions. Metal flashing to which ordanoe bituminous terials are to be adhered shall be. primed prior to installation. (8907.6) :-Signa re rimary Ins bate Signature o ermit ider Date i i