Loading...
Checkoff Sheet MS-2014-02945.tif i i i 2009 INTERNATIONAL RESIDENTIAL CODE CITY OF BLAIR REROOF Return to Blair City/ lull prior to Final Inspection 218S O Street, Blair, NE 68008 Because of limitations caused by the infeasibility to perform detailed inspections which would not interfere with reroofing work, please indicate compliance with the following requirements follov±/inq this reroofing job. Property Address; � Contractor or Homeowner (if self) permit #: MS -2014- Installation date: i YES NO j [� The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (R907.1) ICE PROTECTION_ INSTALLED An ice barrier that consists of at least two layers of underlayment or of a seif- adhering polymer modified bitumen sheet was installed and extends at least from the eave's edge to a point at least 24 inches inside the exterior wall line of the building. (R905.2.7. l ) [� STRUCTURAL COMPONENTS ARE StUND: The structural roof components are capable of supporting the roof covering system and the material and equipment loads that will be encountered during installation of the roof covering system. (8907.2) EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one of the reasons required by section 8907.3 CHID NOT USE RUSTED METAL OR FLASHING: Existing vent flashing, metal edges, drain outlets, collars or metal counter- flashing were not reinstalled if rusted. (R907.5) FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance with approved manufacturer's installation instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation. (R907.6) : S1 n ttur of r1 a stalle Date ign ure o ermit Hol r Da II