Checkoff Sheet MS-2014-02767.tif I
20UV 114TERNATIONAL RESIDENTIAL CORE
CITY OF BLAIR REROOFING CHECKOFF SHEET
etulin to Blair City Mall prior to Final Inspection
218 Street, B lair,
Because of limitations caused by the infeasibility to perform detailed inspections which would
not interfers with reroofing work, please indicate compliance with tho following requirements
following reroofing job.
Property Address'
Contractor or Homeowner (if self)
. i
Permit #: M- 2014 -'�� j
Installation Date: �_� ° ' �" t
YES No
❑ The materials and methods of applioation used for recovering or replacing the existing
roof covering comply with the requirements of the building code. (R907.1)
ICE PROTECTION INSTALLED An Ice barrier that consists of at least two layers of
underlayment or of a self adhering polymer modified bitumen sheet was installed and
4xtends at least from the eave's edge to .a point at least 24 inches inside the exterior
wall line of the building. (ROO5.2,7_1)
❑ ` RL[c - ruRAL COMPONENTS ARE SOUND. The structural roof components are r
capable of supporting the roof covering system' and the material Wd equipment loads
that will be encountered during Installation of the roof covering system. (11907.2)
EX ISTING GOVERING WAS REMOVED: Existing roof covering was removed for one �
of the reasons required by section 8907,3
❑ DID NOT USE RUSTED METAL OR FLASHING: Existing vent flashing, metal edges,
drain outlets, collars or metal counter - flashing were not reinstalled if rusted. (8907.5)
Awe
FLASHING INSTALLED P&QPERL1C: Flashing shall be reconstructed in accordance
with approved man faoturer`s installation instructions. Metal flashing to which
bite ' c�us rriate ' s are to be adhered shall be primed prior to Installation. (8907.5)
/ {J YA
Si of P rTInst er Gate
Sionsfirra abiarmWM D ate