Loading...
Checkoff Sheet MS-2014-02766.tif MHK r'b - EWW 1 J E6: t>t) F - r om: I o: CITY OF • I I. REROOFWG CHECKOFF SHEET Return to Blair City Hall prior td Final inspection 1 S '1 Street, B lair, NE 6$008 Because Of limitations caUsed by the infeasibility to perform detailed Inspections which wound Lint Interfere with reroofing work, please Indicate compllance with the. following requirements following this reroofing job. " Property Address: Contractor or Homeowner (if sei� hermit #: M - 2014 InstallaClon Gate• '` '"' � � l�� _ - - . Y NO The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of they building code. (8907.1) ICE PROTECTION INSTALLED An ice barrier that ednsists of at least two layers of underlayment or of a self- adhering polymer modified bitumen sheet was installed and extends at least from the eave's edge to -a point at least 24 inches inside the exterior wall line of the building. (R905.2.7.1) STRUCTURAL DOMPONFNTS ARE SOUNCI: The structural roof components are f capable of supporting the roof covering systerri and the rnaterlal,�nd equipment loads that will be encountered during installation of the roof covering system. (8907.2) EXISTING COVERING WAS REMOVeD: Existing roof covering was removed for one of the reasons required by section907.3 DIG NOT USE RUSTED METAL OR FLASHING: ixisting vent flashing, metal edges, drain outlets, collars or metal counter - flashing woro not reinstalled'if rusted. (P907.5) FLASHING INSTALLED PROP>;RLY: Flashing shall be reconstructed in accordance with approved manufacturer's installation instructions. Metal flashing to which bituminous Materials are to be adhered shall be primed prior to installation, (R907.6), ig mary I Date Sig nature o — Si L 9 f Permit Helder Date I -