I. REROOFWG CHECKOFF SHEET
Return to Blair City Hall prior td Final inspection
1 S '1 Street, B lair, NE 6$008
Because Of limitations caUsed by the infeasibility to perform detailed Inspections which wound
Lint Interfere with reroofing work, please Indicate compllance with the. following requirements
following this reroofing job. "
Property Address:
Contractor or Homeowner (if sei�
hermit #: M - 2014
InstallaClon Gate• '` '"' � � l�� _ - - .
Y NO
The materials and methods of application used for recovering or replacing the existing
roof covering comply with the requirements of they building code. (8907.1)
ICE PROTECTION INSTALLED An ice barrier that ednsists of at least two layers of
underlayment or of a self- adhering polymer modified bitumen sheet was installed and
extends at least from the eave's edge to -a point at least 24 inches inside the exterior
wall line of the building. (R905.2.7.1)
STRUCTURAL DOMPONFNTS ARE SOUNCI: The structural roof components are f
capable of supporting the roof covering systerri and the rnaterlal,�nd equipment loads
that will be encountered during installation of the roof covering system. (8907.2)
EXISTING COVERING WAS REMOVeD: Existing roof covering was removed for one
of the reasons required by section907.3
DIG NOT USE RUSTED METAL OR FLASHING: ixisting vent flashing, metal edges,
drain outlets, collars or metal counter - flashing woro not reinstalled'if rusted. (P907.5)
FLASHING INSTALLED PROP>;RLY: Flashing shall be reconstructed in accordance
with approved manufacturer's installation instructions. Metal flashing to which
bituminous Materials are to be adhered shall be primed prior to installation, (R907.6),
ig mary I Date
Sig nature o
—
Si L
9 f Permit Helder Date