Loading...
Checkoff Sheet MS-2014-02402.tif MRR -26 -2009 23:54 From: To:4924264195 P.1'8 ' 0 '009 PITEI"'"ATK"'AL RESIDENTIAL CODE 1111 K N UN i n . CITY OF BLAIR REROOFINQ CHECKOFF SHEET Return to Blair City Hall prior t Final Inspection 218SI6 Street, Blair, HE 68008 Because of Ihnitatlons caused by the infeasibility to perform detailed inspections wh1ch would not interfere with reroofing work, please indi+cato compliance with the fbilowing requlremenfs following this reroofing Jab. Property Address: 3e2 Contractor or Homeowner (if self) Porrnim. MS -2014r - Installa6ri Date. YES NO The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (RG07j) ICE PROTECTION INSTALLED: An ice barrier that consists of at least two layers of underlayment or of a self - adhering polymer modified bitumen sheet was installed and extends at least from the cave's edge to a point at least 24 inches inside the exterior -wall line of the building. (R805,2.7,1) STRUCTURAL COMPO ARE SOUND; The structural roof components are r capable cif supporting the roof covering system and the material a*ftd equipment loads that will be encountered during installation of the .roof covering system. (R007.2) EXISTING 60V OVERING WAS REMOVED. Existing roof covering was removed for 6ne of the reasons required by section K907.3 DID NOT USA`. RUSTED METAL OR FLASEIINO. Existing vent flashing, metal edges, drain outlets, collars or metal counter - flashing were not reinstalled if rusted. (R907.5) ' FLASHwe INSTALLED PROPERLY: Plashing shall be reconstructed in accordance with approved manufacturer's installation instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation. (R907.6) iignat rimary Inst bate ignat a er ` older Date